{"title":"采用bina marga 2017和aashto 1993方法进行刚性路面规划的比较研究","authors":"Egi Firgiansyah, P. Prihantono, D. Daryati","doi":"10.21009/jpensil.v11i1.24199","DOIUrl":null,"url":null,"abstract":"This study was conducted to determine what factors influence the differences in the results of the Bina Marga 2017 method and the AASHTO 1993 method and determine which planning results are more efficient to be applied to Letjen S. Parman Street. The research method used is a comparative method, using the existing data and the latest data from surveys. As a result of analyzing a rigid road plan with a planned age of 40 years, the Bina Marga 2017 method obtained a concrete slab with a thickness of 305 mm, and the AASHTO 1993 method obtained a concrete slab with a thickness of 280 mm. Further differences in results can be seen in the level of traffic load during the service life, the diameter of the dowels, the spacing of the tie bars, and the minimum design height of the subgrade embankment. The differences in the results of these plans are caused by two main factors, namely the factor of using the cumulative traffic growth value (R) in the Bina Marga 2017 method and the direct use of the subgrade CBR value in the AASHTO 1993 method. Based on the data that has been obtained, it is concluded that the 1993 AASHTO method provides more efficient results to be applied with considerations in terms of smaller plate dimensions and fewer connections and reinforcement requirements. Which when calculating the work cost, the AASHTO 1993 methods results give a smaller number of work volumes, so it has the possibility to provide a more economical work cost than the Bina Marga 2017 methods results.","PeriodicalId":106203,"journal":{"name":"Jurnal PenSil","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COMPARATIVE STUDY OF RIGID PAVEMENT PLANNING USING BINA MARGA 2017 AND AASHTO 1993 METHODS\",\"authors\":\"Egi Firgiansyah, P. Prihantono, D. Daryati\",\"doi\":\"10.21009/jpensil.v11i1.24199\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study was conducted to determine what factors influence the differences in the results of the Bina Marga 2017 method and the AASHTO 1993 method and determine which planning results are more efficient to be applied to Letjen S. Parman Street. The research method used is a comparative method, using the existing data and the latest data from surveys. As a result of analyzing a rigid road plan with a planned age of 40 years, the Bina Marga 2017 method obtained a concrete slab with a thickness of 305 mm, and the AASHTO 1993 method obtained a concrete slab with a thickness of 280 mm. Further differences in results can be seen in the level of traffic load during the service life, the diameter of the dowels, the spacing of the tie bars, and the minimum design height of the subgrade embankment. The differences in the results of these plans are caused by two main factors, namely the factor of using the cumulative traffic growth value (R) in the Bina Marga 2017 method and the direct use of the subgrade CBR value in the AASHTO 1993 method. Based on the data that has been obtained, it is concluded that the 1993 AASHTO method provides more efficient results to be applied with considerations in terms of smaller plate dimensions and fewer connections and reinforcement requirements. Which when calculating the work cost, the AASHTO 1993 methods results give a smaller number of work volumes, so it has the possibility to provide a more economical work cost than the Bina Marga 2017 methods results.\",\"PeriodicalId\":106203,\"journal\":{\"name\":\"Jurnal PenSil\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal PenSil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21009/jpensil.v11i1.24199\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal PenSil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21009/jpensil.v11i1.24199","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定哪些因素影响了Bina Marga 2017方法与AASHTO 1993方法结果的差异,并确定哪种规划结果更有效地应用于Letjen S. Parman Street。使用的研究方法是比较方法,使用现有数据和最新的调查数据。Bina Marga 2017法和AASHTO 1993法分别对规划年限为40年的刚性道路规划进行了分析,得到了305 mm厚的混凝土板,280 mm厚的混凝土板。结果的进一步差异可以在使用寿命期间的交通荷载水平,榫的直径,拉杆的间距以及路基路堤的最小设计高度中看到。这些方案结果的差异主要由两个因素造成,即Bina Marga 2017方法中使用累积交通增长值(R)的因素和AASHTO 1993方法中直接使用路基CBR值的因素。根据已获得的数据,认为考虑到更小的板尺寸和更少的连接和配筋要求,1993 AASHTO方法可以提供更有效的结果。在计算工作成本时,AASHTO 1993方法的结果给出的工作体积更少,因此它有可能提供比Bina Marga 2017方法结果更经济的工作成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
COMPARATIVE STUDY OF RIGID PAVEMENT PLANNING USING BINA MARGA 2017 AND AASHTO 1993 METHODS
This study was conducted to determine what factors influence the differences in the results of the Bina Marga 2017 method and the AASHTO 1993 method and determine which planning results are more efficient to be applied to Letjen S. Parman Street. The research method used is a comparative method, using the existing data and the latest data from surveys. As a result of analyzing a rigid road plan with a planned age of 40 years, the Bina Marga 2017 method obtained a concrete slab with a thickness of 305 mm, and the AASHTO 1993 method obtained a concrete slab with a thickness of 280 mm. Further differences in results can be seen in the level of traffic load during the service life, the diameter of the dowels, the spacing of the tie bars, and the minimum design height of the subgrade embankment. The differences in the results of these plans are caused by two main factors, namely the factor of using the cumulative traffic growth value (R) in the Bina Marga 2017 method and the direct use of the subgrade CBR value in the AASHTO 1993 method. Based on the data that has been obtained, it is concluded that the 1993 AASHTO method provides more efficient results to be applied with considerations in terms of smaller plate dimensions and fewer connections and reinforcement requirements. Which when calculating the work cost, the AASHTO 1993 methods results give a smaller number of work volumes, so it has the possibility to provide a more economical work cost than the Bina Marga 2017 methods results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
OVERVIEW OF UNDERSTANDING AND PREPAREDNESS FOR EARTHQUAKES IN THE PERSPECTIVE OF VOCATIONAL HIGH SCHOOL STUDENTS DURABILITY OF ASPHALT CONCRETE MIXTURE (AC-WC) USING CRUMB RUBBER WASTE AS AN ADDITIONAL MATERIAL AND PALM FRUIT ASH AS FILLER IMPROVING VOCATIONAL STUDENT COMPETENCIES THROUGH INDUSTRIAL CLASS-BASED EXPERIANTIAL LEARNING GLOW IN THE DARK MEDIAN FRONTAGE AND PEDESTRIAN AS A GUIDE FOR DRIVERS AT NIGHT THE DEVELOPMENT OF HOTS-BASED TECHNICAL MECHANICAL SUBJECT INSTRUMENTS USING A CLASSICAL TEST THEORY APPROACH
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1