可靠性和可用性性能作为优化电力系统的工具

T. Suntio, K. White
{"title":"可靠性和可用性性能作为优化电力系统的工具","authors":"T. Suntio, K. White","doi":"10.1109/INTLEC.1988.22324","DOIUrl":null,"url":null,"abstract":"The authors describe by means of a case study how the reliability and availability performance can be utilized to obtain the optimal solution for uninterruptible power supplies (UPS) from the power systems user's point of view. It is concluded that UPS power systems cannot be optimized if the defined acceptable risk level is not well or not at all defined. In addition, it is noted that optimization is difficult or almost impossible if the reliability and availability performance philosophy and methods are not used or not understood.<<ETX>>","PeriodicalId":169486,"journal":{"name":"10th International Telecommunications Energy Conference","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Reliability and availability performance as a tool to optimize power systems\",\"authors\":\"T. Suntio, K. White\",\"doi\":\"10.1109/INTLEC.1988.22324\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors describe by means of a case study how the reliability and availability performance can be utilized to obtain the optimal solution for uninterruptible power supplies (UPS) from the power systems user's point of view. It is concluded that UPS power systems cannot be optimized if the defined acceptable risk level is not well or not at all defined. In addition, it is noted that optimization is difficult or almost impossible if the reliability and availability performance philosophy and methods are not used or not understood.<<ETX>>\",\"PeriodicalId\":169486,\"journal\":{\"name\":\"10th International Telecommunications Energy Conference\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"10th International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1988.22324\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1988.22324","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

通过一个案例研究,阐述了如何从电力系统用户的角度出发,利用可靠性和可用性性能来获得不间断电源(UPS)的最优解决方案。结论是,如果定义的可接受风险水平没有很好地定义或根本没有定义,则UPS电力系统无法优化。此外,需要注意的是,如果不使用或不理解可靠性和可用性性能理念和方法,则很难或几乎不可能进行优化
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Reliability and availability performance as a tool to optimize power systems
The authors describe by means of a case study how the reliability and availability performance can be utilized to obtain the optimal solution for uninterruptible power supplies (UPS) from the power systems user's point of view. It is concluded that UPS power systems cannot be optimized if the defined acceptable risk level is not well or not at all defined. In addition, it is noted that optimization is difficult or almost impossible if the reliability and availability performance philosophy and methods are not used or not understood.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Conversion of constant current to constant voltage by high-frequency resonant converter Design for a highly efficient distributed power supply system based on reliability analysis Redundant DC-DC switching power supply system for telecommunication equipment The quality required in electrolyte limited, valve regulated lead-acid batteries for telecommunication systems Spectral analysis of input currents of delta PWM converters using discrete Fourier transform
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1