运营商创新并未过时

Opflow Pub Date : 2023-10-01 DOI:10.1002/opfl.1868
Nick Pizzi
{"title":"运营商创新并未过时","authors":"Nick Pizzi","doi":"10.1002/opfl.1868","DOIUrl":null,"url":null,"abstract":"The longer you operate a water utility, the greater the chance you’ll be required to start a new process, or even a new water treatment plant, from scratch. What took months to design and construct is now all yours to operate. You’ve got to be ready to start—now!","PeriodicalId":87333,"journal":{"name":"Opflow","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operator Innovation Hasn’t Gone Out of Style\",\"authors\":\"Nick Pizzi\",\"doi\":\"10.1002/opfl.1868\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The longer you operate a water utility, the greater the chance you’ll be required to start a new process, or even a new water treatment plant, from scratch. What took months to design and construct is now all yours to operate. You’ve got to be ready to start—now!\",\"PeriodicalId\":87333,\"journal\":{\"name\":\"Opflow\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Opflow\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/opfl.1868\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Opflow","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/opfl.1868","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

你经营自来水公司的时间越长,你就越有可能需要从头开始一个新的过程,甚至是一个新的水处理厂。花了几个月时间设计和建造的东西现在由你来操作。你必须准备好,现在就开始!
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Operator Innovation Hasn’t Gone Out of Style
The longer you operate a water utility, the greater the chance you’ll be required to start a new process, or even a new water treatment plant, from scratch. What took months to design and construct is now all yours to operate. You’ve got to be ready to start—now!
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operators Keep Pace With Industry Changes Houston's Northeast Water Purification Plant Completes Phase 1 Expansion Optimization Program Improves Plant Performance Intake Take Advantage of Common‐Sense Cybersecurity Practices
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1