Justin Phillips, Franck Robert, Rachel Monteith, Michael Brooks, Sam Youdan
{"title":"巴特西发电站-一个图标的再生","authors":"Justin Phillips, Franck Robert, Rachel Monteith, Michael Brooks, Sam Youdan","doi":"10.56330/zbeo8463","DOIUrl":null,"url":null,"abstract":"The landmark Grade II* listed Battersea Power Station in London has been sympathetically transformed from a much-loved industrial relic into a vibrant 21st century destination. The redevelopment of the 2 500 00sq.ft building (approx. 230 000m2) was carried out as Phase 2 of an eight-phase, 42-acre regeneration of this former brownfield site on the banks of the River Thames. This article presents a summary of the substantial engineering work undertaken to bring Battersea Power Station back to life. An extremely technically and logistically challenging project has been redeveloped through a series of well-thought- through, simple, yet elegant and buildable solutions to preserve the existing fabric, integrate it seamlessly with the new, and give this icon a new lease of life.","PeriodicalId":135681,"journal":{"name":"The Structural Engineer: journal of the Institution of Structural Engineer","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Battersea Power Station – regeneration of an icon\",\"authors\":\"Justin Phillips, Franck Robert, Rachel Monteith, Michael Brooks, Sam Youdan\",\"doi\":\"10.56330/zbeo8463\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The landmark Grade II* listed Battersea Power Station in London has been sympathetically transformed from a much-loved industrial relic into a vibrant 21st century destination. The redevelopment of the 2 500 00sq.ft building (approx. 230 000m2) was carried out as Phase 2 of an eight-phase, 42-acre regeneration of this former brownfield site on the banks of the River Thames. This article presents a summary of the substantial engineering work undertaken to bring Battersea Power Station back to life. An extremely technically and logistically challenging project has been redeveloped through a series of well-thought- through, simple, yet elegant and buildable solutions to preserve the existing fabric, integrate it seamlessly with the new, and give this icon a new lease of life.\",\"PeriodicalId\":135681,\"journal\":{\"name\":\"The Structural Engineer: journal of the Institution of Structural Engineer\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Structural Engineer: journal of the Institution of Structural Engineer\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56330/zbeo8463\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Structural Engineer: journal of the Institution of Structural Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56330/zbeo8463","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The landmark Grade II* listed Battersea Power Station in London has been sympathetically transformed from a much-loved industrial relic into a vibrant 21st century destination. The redevelopment of the 2 500 00sq.ft building (approx. 230 000m2) was carried out as Phase 2 of an eight-phase, 42-acre regeneration of this former brownfield site on the banks of the River Thames. This article presents a summary of the substantial engineering work undertaken to bring Battersea Power Station back to life. An extremely technically and logistically challenging project has been redeveloped through a series of well-thought- through, simple, yet elegant and buildable solutions to preserve the existing fabric, integrate it seamlessly with the new, and give this icon a new lease of life.