{"title":"团队规模和工作坊持续时间对价值工程提案的影响","authors":"Muhammad A. Al-Ghamdi","doi":"10.36348/sjce.2023.v07i08.004","DOIUrl":null,"url":null,"abstract":"The paper assessed 28 Value Engineering (VE) reports of studies conducted by third party VE consultants on Saudi Aramco capital projects from January 2020 to August 2022. The findings indicate that there is an inverse relationship between accepted number of VE proposals and the size of the workshop review team (the larger the team, the smaller percentage of accepted proposals). It, also, showed that accepted number of VE proposals is not influenced by the duration of VE workshops. The paper recommends the optimization of the size of VE teams and optimized workshop durations to be aligned to Saudi Aramco (SA) capital management system project classifications. The recommendations may result in increasing the number of quality accepted VE proposals while reducing the cost of VE workshops.","PeriodicalId":437137,"journal":{"name":"Saudi Journal of Civil Engineering","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Impact of Team Size and Workshop Duration on Value Engineering Proposals\",\"authors\":\"Muhammad A. Al-Ghamdi\",\"doi\":\"10.36348/sjce.2023.v07i08.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper assessed 28 Value Engineering (VE) reports of studies conducted by third party VE consultants on Saudi Aramco capital projects from January 2020 to August 2022. The findings indicate that there is an inverse relationship between accepted number of VE proposals and the size of the workshop review team (the larger the team, the smaller percentage of accepted proposals). It, also, showed that accepted number of VE proposals is not influenced by the duration of VE workshops. The paper recommends the optimization of the size of VE teams and optimized workshop durations to be aligned to Saudi Aramco (SA) capital management system project classifications. The recommendations may result in increasing the number of quality accepted VE proposals while reducing the cost of VE workshops.\",\"PeriodicalId\":437137,\"journal\":{\"name\":\"Saudi Journal of Civil Engineering\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Saudi Journal of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36348/sjce.2023.v07i08.004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Saudi Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36348/sjce.2023.v07i08.004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Impact of Team Size and Workshop Duration on Value Engineering Proposals
The paper assessed 28 Value Engineering (VE) reports of studies conducted by third party VE consultants on Saudi Aramco capital projects from January 2020 to August 2022. The findings indicate that there is an inverse relationship between accepted number of VE proposals and the size of the workshop review team (the larger the team, the smaller percentage of accepted proposals). It, also, showed that accepted number of VE proposals is not influenced by the duration of VE workshops. The paper recommends the optimization of the size of VE teams and optimized workshop durations to be aligned to Saudi Aramco (SA) capital management system project classifications. The recommendations may result in increasing the number of quality accepted VE proposals while reducing the cost of VE workshops.