评估新兴经济体PPP项目的关键障碍和成功因素:以越南为例

IF 2.6 Q1 ENGINEERING, MULTIDISCIPLINARY Journal of Engineering Design and Technology Pub Date : 2023-11-02 DOI:10.1108/jedt-08-2023-0340
Hung Duy Nguyen, Tuan Anh Nguyen, Vi Vu Doan, Chau Ngoc Dang
{"title":"评估新兴经济体PPP项目的关键障碍和成功因素:以越南为例","authors":"Hung Duy Nguyen, Tuan Anh Nguyen, Vi Vu Doan, Chau Ngoc Dang","doi":"10.1108/jedt-08-2023-0340","DOIUrl":null,"url":null,"abstract":"Purpose Public–private partnership (PPP) projects play a pivotal role in fostering infrastructure development in developing countries. This study aims to identify major barriers and critical success factors (CSFs) for PPP projects in Vietnam. Design/methodology/approach The study initially conducted an extensive literature review and interviewed industry experts to compile a comprehensive list of barriers and success factors. Subsequently, a survey involving 250 construction professionals was conducted to assess these identified factors. The research used both ANOVA test and hierarchical regression analysis to explore the relationship between participants’ characteristics and assessments. Findings The results could provide a valuable reference for practitioners by assessing barriers and CSFs in PPP projects. Specifically, the ANOVA analysis indicated a positive correlation between barrier assessment and participants’ experience, while the influence of participants’ sector on the evaluation was minor. Furthermore, the hierarchical regression analysis demonstrated that participants’ sector did not moderate the relationship between barrier assessment and industry experience. Originality/value This research contributes to the existing literature by offering empirical insights into barriers and CSFs specific to PPP projects in a developing country context. The findings highlight the crucial role of experienced professionals in ensuring PPP project success. Moreover, the study provides construction practitioners with a better understanding of the essential factors and supports the development of effective management strategies for future PPP projects.","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":"11 3","pages":"0"},"PeriodicalIF":2.6000,"publicationDate":"2023-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessing critical barriers and success factors of PPP projects in emerging economies: a case of Vietnam\",\"authors\":\"Hung Duy Nguyen, Tuan Anh Nguyen, Vi Vu Doan, Chau Ngoc Dang\",\"doi\":\"10.1108/jedt-08-2023-0340\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose Public–private partnership (PPP) projects play a pivotal role in fostering infrastructure development in developing countries. This study aims to identify major barriers and critical success factors (CSFs) for PPP projects in Vietnam. Design/methodology/approach The study initially conducted an extensive literature review and interviewed industry experts to compile a comprehensive list of barriers and success factors. Subsequently, a survey involving 250 construction professionals was conducted to assess these identified factors. The research used both ANOVA test and hierarchical regression analysis to explore the relationship between participants’ characteristics and assessments. Findings The results could provide a valuable reference for practitioners by assessing barriers and CSFs in PPP projects. Specifically, the ANOVA analysis indicated a positive correlation between barrier assessment and participants’ experience, while the influence of participants’ sector on the evaluation was minor. Furthermore, the hierarchical regression analysis demonstrated that participants’ sector did not moderate the relationship between barrier assessment and industry experience. Originality/value This research contributes to the existing literature by offering empirical insights into barriers and CSFs specific to PPP projects in a developing country context. The findings highlight the crucial role of experienced professionals in ensuring PPP project success. Moreover, the study provides construction practitioners with a better understanding of the essential factors and supports the development of effective management strategies for future PPP projects.\",\"PeriodicalId\":46533,\"journal\":{\"name\":\"Journal of Engineering Design and Technology\",\"volume\":\"11 3\",\"pages\":\"0\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2023-11-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Design and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jedt-08-2023-0340\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jedt-08-2023-0340","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

公私伙伴关系(PPP)项目在促进发展中国家基础设施发展方面发挥着关键作用。本研究旨在确定越南PPP项目的主要障碍和关键成功因素。该研究最初进行了广泛的文献回顾,并采访了行业专家,以编制一份全面的障碍和成功因素清单。随后,我们进行了一项涉及250名建筑专业人员的调查,以评估这些确定的因素。本研究采用方差分析与层次回归分析相结合的方法来探讨被试特征与评价之间的关系。研究结果可为PPP项目实施过程中的障碍和风险风险评估提供有价值的参考。具体而言,方差分析表明障碍评估与参与者的经验之间存在正相关关系,而参与者所在行业对评估的影响较小。此外,层次回归分析表明,参与者所在行业对障碍评估与行业经验之间的关系没有调节作用。原创性/价值本研究通过对发展中国家PPP项目特有的障碍和CSFs提供实证见解,对现有文献做出了贡献。研究结果强调了经验丰富的专业人员在确保PPP项目成功方面的关键作用。此外,本研究有助建造业从业员更好地了解这些关键因素,并为未来的PPP项目制定有效的管理策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Assessing critical barriers and success factors of PPP projects in emerging economies: a case of Vietnam
Purpose Public–private partnership (PPP) projects play a pivotal role in fostering infrastructure development in developing countries. This study aims to identify major barriers and critical success factors (CSFs) for PPP projects in Vietnam. Design/methodology/approach The study initially conducted an extensive literature review and interviewed industry experts to compile a comprehensive list of barriers and success factors. Subsequently, a survey involving 250 construction professionals was conducted to assess these identified factors. The research used both ANOVA test and hierarchical regression analysis to explore the relationship between participants’ characteristics and assessments. Findings The results could provide a valuable reference for practitioners by assessing barriers and CSFs in PPP projects. Specifically, the ANOVA analysis indicated a positive correlation between barrier assessment and participants’ experience, while the influence of participants’ sector on the evaluation was minor. Furthermore, the hierarchical regression analysis demonstrated that participants’ sector did not moderate the relationship between barrier assessment and industry experience. Originality/value This research contributes to the existing literature by offering empirical insights into barriers and CSFs specific to PPP projects in a developing country context. The findings highlight the crucial role of experienced professionals in ensuring PPP project success. Moreover, the study provides construction practitioners with a better understanding of the essential factors and supports the development of effective management strategies for future PPP projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Design and Technology
Journal of Engineering Design and Technology ENGINEERING, MULTIDISCIPLINARY-
CiteScore
6.50
自引率
21.40%
发文量
67
期刊介绍: - Design strategies - Usability and adaptability - Material, component and systems performance - Process control - Alternative and new technologies - Organizational, management and research issues - Human factors - Environmental, quality and health and safety issues - Cost and life cycle issues - Sustainability criteria, indicators, measurement and practices - Risk management - Entrepreneurship Law, regulation and governance - Design, implementing, managing and practicing innovation - Visualization, simulation, information and communication technologies - Education practices, innovation, strategies and policy issues.
期刊最新文献
Development and validation of a framework for improving health and safety risk management at informal construction sites in Tanzania Impact of project risk allocation on PPP housing project delivery in Nigeria: partial least square structural equation modeling approach Ensemble of ensembles for fine particulate matter pollution prediction using big data analytics and IoT emission sensors Resource sustainability in the water, energy and food nexus: role of technological innovation Mechanical and microstructural characteristics of structural concrete containing RCA treated with sodium metasilicate
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1