{"title":"考虑供应中断的备用采购两阶段产能保留合同模型","authors":"Sidharath Joshi, Huynh Trung Luong","doi":"10.1080/21681015.2023.2264288","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":16024,"journal":{"name":"Journal of Industrial and Production Engineering","volume":"233 3","pages":"0"},"PeriodicalIF":4.0000,"publicationDate":"2023-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A two-stage capacity reservation contract model with backup sourcing considering supply side disruptions\",\"authors\":\"Sidharath Joshi, Huynh Trung Luong\",\"doi\":\"10.1080/21681015.2023.2264288\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":16024,\"journal\":{\"name\":\"Journal of Industrial and Production Engineering\",\"volume\":\"233 3\",\"pages\":\"0\"},\"PeriodicalIF\":4.0000,\"publicationDate\":\"2023-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Industrial and Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/21681015.2023.2264288\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial and Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/21681015.2023.2264288","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}