基于广义优先关系的建设项目优化调度:一个现实案例研究

IF 1.4 4区 工程技术 Q2 ENGINEERING, MULTIDISCIPLINARY Scientia Iranica Pub Date : 2023-08-30 DOI:10.24200/sci.2023.59493.6275
Saman Aminbakhsh, Ary Ahmed
{"title":"基于广义优先关系的建设项目优化调度:一个现实案例研究","authors":"Saman Aminbakhsh, Ary Ahmed","doi":"10.24200/sci.2023.59493.6275","DOIUrl":null,"url":null,"abstract":"Concomitant reduction of cost and duration is recognized as one of the main aspects of construction planning. Expedition of project schedule naturally incurs extra costs due to implementation of more productive and/or high-price construction techniques. Meanwhile, a reduction in time is usually plausible only down to a certain limit, below which renders expeditions either technically or financially unviable. Thus, striking a reasonable balance between project cost and duration remains a desirable yet challenging task for which there has been a myriad of advancements and literature. Despite the many studies associated with this problem – referred to as time-cost trade-off problem (TCTP) – it is observed that only a few exercise TCTPs with generalized logical relationships. This observation holds despite the fact that generalized precedence relationships are imperative to introduce parallelism and to secure a realistic overlap among the activities. In this regard, a Simulated Annealing-based Genetic Algorithm as proposed herein, is specifically designed to provide the capability of exerting TCTPs with properly overlapped activities. Efficiency of this algorithm is tested over a wide range of problems and its performance is validated over a large-scale real-case construction project. Results of the hybridized GA indicate fast and robust convergence to high-quality solutions.","PeriodicalId":21605,"journal":{"name":"Scientia Iranica","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization-based Scheduling of Construction Projects with Generalized Precedence Relationships: A Real-Life Case Study\",\"authors\":\"Saman Aminbakhsh, Ary Ahmed\",\"doi\":\"10.24200/sci.2023.59493.6275\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Concomitant reduction of cost and duration is recognized as one of the main aspects of construction planning. Expedition of project schedule naturally incurs extra costs due to implementation of more productive and/or high-price construction techniques. Meanwhile, a reduction in time is usually plausible only down to a certain limit, below which renders expeditions either technically or financially unviable. Thus, striking a reasonable balance between project cost and duration remains a desirable yet challenging task for which there has been a myriad of advancements and literature. Despite the many studies associated with this problem – referred to as time-cost trade-off problem (TCTP) – it is observed that only a few exercise TCTPs with generalized logical relationships. This observation holds despite the fact that generalized precedence relationships are imperative to introduce parallelism and to secure a realistic overlap among the activities. In this regard, a Simulated Annealing-based Genetic Algorithm as proposed herein, is specifically designed to provide the capability of exerting TCTPs with properly overlapped activities. Efficiency of this algorithm is tested over a wide range of problems and its performance is validated over a large-scale real-case construction project. Results of the hybridized GA indicate fast and robust convergence to high-quality solutions.\",\"PeriodicalId\":21605,\"journal\":{\"name\":\"Scientia Iranica\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2023-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientia Iranica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24200/sci.2023.59493.6275\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientia Iranica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24200/sci.2023.59493.6275","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

同时降低成本和工期被认为是施工规划的主要方面之一。由于实施更高效和/或高价格的施工技术,项目进度的延长自然会产生额外的成本。同时,将时间缩短到一定限度通常是可行的,低于这个限度,探险在技术上或经济上都是不可行的。因此,在项目成本和工期之间取得合理的平衡仍然是一项令人满意但具有挑战性的任务,已经有无数的进步和文献。尽管有许多研究与这个问题相关——被称为时间成本权衡问题(TCTP)——但据观察,只有少数研究将TCTP与广义逻辑关系结合起来。尽管普遍化的优先关系对于引入并行性和确保活动之间的实际重叠是必要的,但这个观察结果仍然成立。在这方面,本文提出了一种基于模拟退火的遗传算法,专门用于提供发挥具有适当重叠活动的TCTPs的能力。在广泛的问题上测试了该算法的效率,并在大规模的实际工程中验证了其性能。结果表明,混合遗传算法收敛速度快,鲁棒性好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimization-based Scheduling of Construction Projects with Generalized Precedence Relationships: A Real-Life Case Study
Concomitant reduction of cost and duration is recognized as one of the main aspects of construction planning. Expedition of project schedule naturally incurs extra costs due to implementation of more productive and/or high-price construction techniques. Meanwhile, a reduction in time is usually plausible only down to a certain limit, below which renders expeditions either technically or financially unviable. Thus, striking a reasonable balance between project cost and duration remains a desirable yet challenging task for which there has been a myriad of advancements and literature. Despite the many studies associated with this problem – referred to as time-cost trade-off problem (TCTP) – it is observed that only a few exercise TCTPs with generalized logical relationships. This observation holds despite the fact that generalized precedence relationships are imperative to introduce parallelism and to secure a realistic overlap among the activities. In this regard, a Simulated Annealing-based Genetic Algorithm as proposed herein, is specifically designed to provide the capability of exerting TCTPs with properly overlapped activities. Efficiency of this algorithm is tested over a wide range of problems and its performance is validated over a large-scale real-case construction project. Results of the hybridized GA indicate fast and robust convergence to high-quality solutions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientia Iranica
Scientia Iranica 工程技术-工程:综合
CiteScore
2.90
自引率
7.10%
发文量
59
审稿时长
2 months
期刊介绍: The objectives of Scientia Iranica are two-fold. The first is to provide a forum for the presentation of original works by scientists and engineers from around the world. The second is to open an effective channel to enhance the level of communication between scientists and engineers and the exchange of state-of-the-art research and ideas. The scope of the journal is broad and multidisciplinary in technical sciences and engineering. It encompasses theoretical and experimental research. Specific areas include but not limited to chemistry, chemical engineering, civil engineering, control and computer engineering, electrical engineering, material, manufacturing and industrial management, mathematics, mechanical engineering, nuclear engineering, petroleum engineering, physics, nanotechnology.
期刊最新文献
A New Approach to Estimating Destinations in Open Automated Fare Collection Systems based on errors-against-errors strategy Shared autonomous vehicle with pooled service, a modal shift approach Analysis of waves subjected to mechanical force and voids source in an initially stressed magneto-elastic medium with corrugated and impedance boundary Numerical study of slip and Magnetohydrodynamics (MHD) in calendering process using non-Newtonian fluid An efficient biogas-base tri-generation of power, heating and cooling integrating inverted Brayton and ejector transcritical CO2 cycles: exergoeconomic evaluation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1