确认缓冲区对正在开发、恢复或修复的土地的重要性:对保护生态资源的规划。

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS ACS Applied Bio Materials Pub Date : 2024-02-16 Epub Date: 2023-12-26 DOI:10.1080/15287394.2023.2285511
Joanna Burger, Michael Gochfeld, Kevin G Brown, Kelly Ng, Monica Cortes, David Kosson
{"title":"确认缓冲区对正在开发、恢复或修复的土地的重要性:对保护生态资源的规划。","authors":"Joanna Burger, Michael Gochfeld, Kevin G Brown, Kelly Ng, Monica Cortes, David Kosson","doi":"10.1080/15287394.2023.2285511","DOIUrl":null,"url":null,"abstract":"<p><p>Environmental management relies on many types of information before making decisions regarding remediation, restoration, or other land use decisions, including ecological data, such as risks to species, populations, communities, and ecosystems. The aim of this investigation was to describe the ecological information required within the context of making environmental decisions and providing visual communication tools for regulators, conservationists, and the public to understand the risk to ecological resources on- and off-site. It is suggested that ecological information used in environmental decisions is required to be transparent throughout the planning and execution of a project, which needs to include: 1) ecological information and evaluations within development areas or units (in this case, watersheds), and 2) resources in adjacent areas (Buffer Zones) that might be affected. The Melton Valley administrative watershed (Oak Ridge Reservation, TN) is used as a case study because this site still has active facility development and environmental remediation, and there are important ecological resources on and off-site. Data indicate that although there are important resources on Melton Valley administrative watershed, there are also significant resources in the Buffer Zone around the watershed. Compared to the Melton Valley administrative watershed, the Buffer Zone contains more Interior (and Buffer) Forest and greater value resources. The point is made that when remediation, restoration, or development occurs, it is equally important to consider resources that are adjacent to the site in a Buffer Zone, particularly when remediation and development might continue for many years or decades.</p>","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2024-02-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10843829/pdf/","citationCount":"0","resultStr":"{\"title\":\"The importance of recognizing Buffer Zones to lands being developed, restored, or remediated: on planning for protection of ecological resources.\",\"authors\":\"Joanna Burger, Michael Gochfeld, Kevin G Brown, Kelly Ng, Monica Cortes, David Kosson\",\"doi\":\"10.1080/15287394.2023.2285511\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Environmental management relies on many types of information before making decisions regarding remediation, restoration, or other land use decisions, including ecological data, such as risks to species, populations, communities, and ecosystems. The aim of this investigation was to describe the ecological information required within the context of making environmental decisions and providing visual communication tools for regulators, conservationists, and the public to understand the risk to ecological resources on- and off-site. It is suggested that ecological information used in environmental decisions is required to be transparent throughout the planning and execution of a project, which needs to include: 1) ecological information and evaluations within development areas or units (in this case, watersheds), and 2) resources in adjacent areas (Buffer Zones) that might be affected. The Melton Valley administrative watershed (Oak Ridge Reservation, TN) is used as a case study because this site still has active facility development and environmental remediation, and there are important ecological resources on and off-site. Data indicate that although there are important resources on Melton Valley administrative watershed, there are also significant resources in the Buffer Zone around the watershed. Compared to the Melton Valley administrative watershed, the Buffer Zone contains more Interior (and Buffer) Forest and greater value resources. The point is made that when remediation, restoration, or development occurs, it is equally important to consider resources that are adjacent to the site in a Buffer Zone, particularly when remediation and development might continue for many years or decades.</p>\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2024-02-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10843829/pdf/\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"3\",\"ListUrlMain\":\"https://doi.org/10.1080/15287394.2023.2285511\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2023/12/26 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"3","ListUrlMain":"https://doi.org/10.1080/15287394.2023.2285511","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2023/12/26 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

摘要

环境管理在做出有关补救、恢复或其他土地利用决策的决策之前,依赖于许多类型的信息,包括生态数据,如对物种、种群、社区和生态系统的风险。本次调查的目的是描述环境决策所需的生态信息,并为监管机构、保护主义者和公众提供可视化的沟通工具,以了解现场和场外生态资源的风险。建议在整个项目规划和执行过程中,环境决策中使用的生态信息必须是透明的,这需要包括:1)开发区域或单元(在本例中为流域)内的生态信息和评价;2)可能受到影响的邻近区域(缓冲区)的资源。梅尔顿河谷行政分水岭(田纳西州橡树岭保留地)被用作案例研究,因为该地点仍然有积极的设施开发和环境修复,并且在场地内外都有重要的生态资源。数据表明,虽然梅尔顿河谷行政流域有重要的资源,但在流域周围的缓冲区也有重要的资源。与梅尔顿河谷行政流域相比,缓冲区包含更多的内部(和缓冲)森林和更大的价值资源。在进行补救、恢复或开发时,同样重要的是要考虑缓冲区内毗邻该地点的资源,特别是当补救和开发可能持续多年或数十年的时候。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The importance of recognizing Buffer Zones to lands being developed, restored, or remediated: on planning for protection of ecological resources.

Environmental management relies on many types of information before making decisions regarding remediation, restoration, or other land use decisions, including ecological data, such as risks to species, populations, communities, and ecosystems. The aim of this investigation was to describe the ecological information required within the context of making environmental decisions and providing visual communication tools for regulators, conservationists, and the public to understand the risk to ecological resources on- and off-site. It is suggested that ecological information used in environmental decisions is required to be transparent throughout the planning and execution of a project, which needs to include: 1) ecological information and evaluations within development areas or units (in this case, watersheds), and 2) resources in adjacent areas (Buffer Zones) that might be affected. The Melton Valley administrative watershed (Oak Ridge Reservation, TN) is used as a case study because this site still has active facility development and environmental remediation, and there are important ecological resources on and off-site. Data indicate that although there are important resources on Melton Valley administrative watershed, there are also significant resources in the Buffer Zone around the watershed. Compared to the Melton Valley administrative watershed, the Buffer Zone contains more Interior (and Buffer) Forest and greater value resources. The point is made that when remediation, restoration, or development occurs, it is equally important to consider resources that are adjacent to the site in a Buffer Zone, particularly when remediation and development might continue for many years or decades.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1