为尼日利亚各州水务局提供施工后支持(PCS)服务:制约因素与前进方向

IF 0.7 Q3 GEOGRAPHY GeoScape Pub Date : 2023-12-01 DOI:10.2478/geosc-2023-0012
M. Obeta, Uchenna Paulinus Okafor, C. I. Nnoli
{"title":"为尼日利亚各州水务局提供施工后支持(PCS)服务:制约因素与前进方向","authors":"M. Obeta, Uchenna Paulinus Okafor, C. I. Nnoli","doi":"10.2478/geosc-2023-0012","DOIUrl":null,"url":null,"abstract":"Abstract Post-construction Support (PCS) services refer to all forms of assistance/support given to water service providers (WSPs) to enable them to detect, correct and maintain water system infrastructure or prevent future system faults. PCS enhances the quality and sustainability of water supply services. This paper examines the provision of PCS to state water authorities in Nigeria. Specifically, we identified the sources of PCS and relevance of PCS; then we discussed the pattern of occurrence of system faults the bureaucracy associated with PCS provision across the sampled states. Finally, we examined the constraints to PCS provision and the options for overcoming the challenges. The study used empirical data derived from questionnaire surveys, through key informant interviews (KIIs) and from published literature. The data were analyzed using descriptive statistical tools. Results of the study revealed the current sources and patterns of PCS provision which vary widely across the sampled states. PCS is provided intermittently based on resource availability and on the willingness of the provider. The constraints and bureaucracies associated with PCS provision cause prolonged and avoidable delays and limit quality service delivery with often great consequences for the end users. WSPs lack legislative, and policy instruments to compel governments to act and ensure that PCS services are provided speedily and in a sustainable manner. The poor quality of service delivery in the area can be traced, in part, to a lack of needed PCS services. Consequently, the way forward for WSPs is to confront the dearth of PCS in the water supply sector frontally. Suggestions on how to surmount the dearth of PCS and improve the quality of service delivery in the area were advanced.","PeriodicalId":42291,"journal":{"name":"GeoScape","volume":null,"pages":null},"PeriodicalIF":0.7000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Provision of post construction support (PCS) services to state water authorities in Nigeria: constraints and the way forward\",\"authors\":\"M. Obeta, Uchenna Paulinus Okafor, C. I. Nnoli\",\"doi\":\"10.2478/geosc-2023-0012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Post-construction Support (PCS) services refer to all forms of assistance/support given to water service providers (WSPs) to enable them to detect, correct and maintain water system infrastructure or prevent future system faults. PCS enhances the quality and sustainability of water supply services. This paper examines the provision of PCS to state water authorities in Nigeria. Specifically, we identified the sources of PCS and relevance of PCS; then we discussed the pattern of occurrence of system faults the bureaucracy associated with PCS provision across the sampled states. Finally, we examined the constraints to PCS provision and the options for overcoming the challenges. The study used empirical data derived from questionnaire surveys, through key informant interviews (KIIs) and from published literature. The data were analyzed using descriptive statistical tools. Results of the study revealed the current sources and patterns of PCS provision which vary widely across the sampled states. PCS is provided intermittently based on resource availability and on the willingness of the provider. The constraints and bureaucracies associated with PCS provision cause prolonged and avoidable delays and limit quality service delivery with often great consequences for the end users. WSPs lack legislative, and policy instruments to compel governments to act and ensure that PCS services are provided speedily and in a sustainable manner. The poor quality of service delivery in the area can be traced, in part, to a lack of needed PCS services. Consequently, the way forward for WSPs is to confront the dearth of PCS in the water supply sector frontally. Suggestions on how to surmount the dearth of PCS and improve the quality of service delivery in the area were advanced.\",\"PeriodicalId\":42291,\"journal\":{\"name\":\"GeoScape\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"GeoScape\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/geosc-2023-0012\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"GEOGRAPHY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"GeoScape","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/geosc-2023-0012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOGRAPHY","Score":null,"Total":0}
引用次数: 0

摘要

摘要 施工后支持(PCS)服务是指为供水服务提供商(WSP)提供的各种形式的援助/支持,使其能够检测、纠正和维护供水系统基础设施或防止未来系统故障。PCS 可提高供水服务的质量和可持续性。本文研究了向尼日利亚各州水务局提供 PCS 的情况。具体而言,我们确定了 PCS 的来源和相关性;然后,我们讨论了系统故障的发生模式以及与各抽样州提供 PCS 相关的官僚主义。最后,我们研究了提供 PCS 的制约因素以及克服这些挑战的备选方案。本研究使用的经验数据来自问卷调查、关键信息提供者访谈(KII)和已发表的文献。数据使用描述性统计工具进行分析。研究结果表明,目前提供 PCS 的来源和模式在各抽样州之间存在很大差异。个人护理服务是根据资源的可用性和提供者的意愿断断续续提供的。与提供个人护理服务相关的制约因素和官僚作风造成了本可避免的长期延误,限制了优质服务的提供,往往给最终用户带来严重后果。供水服务提供商缺乏立法和政策工具,无法迫使政府采取行动,确保以可持续的方式迅速 提供供水服务。该地区服务质量低下的部分原因是缺乏所需的个人和社区服务。因此,自来水公司的前进方向是直面供水部门缺乏个人用户服务的问题。与会者还就如何克服 PCS 短缺的问题并提高该地区的服务质量提出了建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Provision of post construction support (PCS) services to state water authorities in Nigeria: constraints and the way forward
Abstract Post-construction Support (PCS) services refer to all forms of assistance/support given to water service providers (WSPs) to enable them to detect, correct and maintain water system infrastructure or prevent future system faults. PCS enhances the quality and sustainability of water supply services. This paper examines the provision of PCS to state water authorities in Nigeria. Specifically, we identified the sources of PCS and relevance of PCS; then we discussed the pattern of occurrence of system faults the bureaucracy associated with PCS provision across the sampled states. Finally, we examined the constraints to PCS provision and the options for overcoming the challenges. The study used empirical data derived from questionnaire surveys, through key informant interviews (KIIs) and from published literature. The data were analyzed using descriptive statistical tools. Results of the study revealed the current sources and patterns of PCS provision which vary widely across the sampled states. PCS is provided intermittently based on resource availability and on the willingness of the provider. The constraints and bureaucracies associated with PCS provision cause prolonged and avoidable delays and limit quality service delivery with often great consequences for the end users. WSPs lack legislative, and policy instruments to compel governments to act and ensure that PCS services are provided speedily and in a sustainable manner. The poor quality of service delivery in the area can be traced, in part, to a lack of needed PCS services. Consequently, the way forward for WSPs is to confront the dearth of PCS in the water supply sector frontally. Suggestions on how to surmount the dearth of PCS and improve the quality of service delivery in the area were advanced.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
GeoScape
GeoScape GEOGRAPHY-
CiteScore
2.70
自引率
7.70%
发文量
7
审稿时长
4 weeks
期刊最新文献
Visualising administrative division dynamics: transformation of borders and names in the Bohemian-Saxonian borderland Assessing current use and visions for sacral complexes in a landscape: An example from Central Europe Measuring the Gender Gap Index using socio-economic variability: A case study based on Modified Global Gender Gap Index (Sehore Municipal Council, India) Differentiation of developmental priorities of different-sized municipalities in the period of acceleration of developmental changes – an example of a mining region Provision of post construction support (PCS) services to state water authorities in Nigeria: constraints and the way forward
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1