{"title":"缩小差距?评估旁遮普省公私合作教育计划的成效","authors":"Ali H. Ansari","doi":"10.1016/j.ijer.2024.102325","DOIUrl":null,"url":null,"abstract":"<div><p>The study examines the effectiveness of Punjab's Public Private Partnership (PPP) programmes in Education in improving value-added math, English and Urdu test scores for grade four pupils. The use of an instrumental variable (IV) approach was possible to assess the impact of PPP schooling on student achievement for two (out of four) PPP programmes. Using the IV approach, the study finds that of the various PPP models being implemented in Punjab, only the private school subsidy programme has a positive, statistically significant association with math student achievement, with students scoring 0.5 standard deviations higher than public school students. However, an Oster (2019) bias adjustment procedure suggests the magnitude of the effect may be overstated. This study finds no evidence that PPP schools are more effective than public schools at improving learning outcomes for socio-economically disadvantaged students.</p></div>","PeriodicalId":48076,"journal":{"name":"International Journal of Educational Research","volume":"125 ","pages":"Article 102325"},"PeriodicalIF":2.6000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bridging the gap? Evaluating the effectiveness of Punjab's public–private partnership programmes in education\",\"authors\":\"Ali H. Ansari\",\"doi\":\"10.1016/j.ijer.2024.102325\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The study examines the effectiveness of Punjab's Public Private Partnership (PPP) programmes in Education in improving value-added math, English and Urdu test scores for grade four pupils. The use of an instrumental variable (IV) approach was possible to assess the impact of PPP schooling on student achievement for two (out of four) PPP programmes. Using the IV approach, the study finds that of the various PPP models being implemented in Punjab, only the private school subsidy programme has a positive, statistically significant association with math student achievement, with students scoring 0.5 standard deviations higher than public school students. However, an Oster (2019) bias adjustment procedure suggests the magnitude of the effect may be overstated. This study finds no evidence that PPP schools are more effective than public schools at improving learning outcomes for socio-economically disadvantaged students.</p></div>\",\"PeriodicalId\":48076,\"journal\":{\"name\":\"International Journal of Educational Research\",\"volume\":\"125 \",\"pages\":\"Article 102325\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Educational Research\",\"FirstCategoryId\":\"95\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0883035524000120\",\"RegionNum\":3,\"RegionCategory\":\"教育学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"EDUCATION & EDUCATIONAL RESEARCH\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Educational Research","FirstCategoryId":"95","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0883035524000120","RegionNum":3,"RegionCategory":"教育学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"EDUCATION & EDUCATIONAL RESEARCH","Score":null,"Total":0}
引用次数: 0
摘要
本研究探讨了旁遮普省教育领域的公私合作伙伴关系(PPP)计划在提高四年级学生数学、英语和乌尔都语考试成绩增值方面的有效性。通过使用工具变量(IV)方法,可以评估公私合作办学对(四项公私合作计划中的)两项计划的学生成绩的影响。利用 IV 方法,研究发现,在旁遮普邦实施的各种公私伙伴关系模式中,只有私立学校补贴计划与数学学生的成绩有积极的、统计意义上的关联,学生的成绩比公立学校学生高出 0.5 个标准差。然而,Oster(2019 年)的偏差调整程序表明,该效应的幅度可能被夸大了。本研究没有发现任何证据表明,在提高社会经济弱势学生的学习成绩方面,公私合作学校比公立学校更有效。
Bridging the gap? Evaluating the effectiveness of Punjab's public–private partnership programmes in education
The study examines the effectiveness of Punjab's Public Private Partnership (PPP) programmes in Education in improving value-added math, English and Urdu test scores for grade four pupils. The use of an instrumental variable (IV) approach was possible to assess the impact of PPP schooling on student achievement for two (out of four) PPP programmes. Using the IV approach, the study finds that of the various PPP models being implemented in Punjab, only the private school subsidy programme has a positive, statistically significant association with math student achievement, with students scoring 0.5 standard deviations higher than public school students. However, an Oster (2019) bias adjustment procedure suggests the magnitude of the effect may be overstated. This study finds no evidence that PPP schools are more effective than public schools at improving learning outcomes for socio-economically disadvantaged students.
期刊介绍:
The International Journal of Educational Research publishes regular papers and special issues on specific topics of interest to international audiences of educational researchers. Examples of recent Special Issues published in the journal illustrate the breadth of topics that have be included in the journal: Students Perspectives on Learning Environments, Social, Motivational and Emotional Aspects of Learning Disabilities, Epistemological Beliefs and Domain, Analyzing Mathematics Classroom Cultures and Practices, and Music Education: A site for collaborative creativity.