发展中国家公共建筑项目成本超支最小化的关键成功因素:加纳案例

Francis Nuako, F. A. Ghansah, Thomas Adusei
{"title":"发展中国家公共建筑项目成本超支最小化的关键成功因素:加纳案例","authors":"Francis Nuako, F. A. Ghansah, Thomas Adusei","doi":"10.1108/ci-07-2022-0176","DOIUrl":null,"url":null,"abstract":"\nPurpose\nIt is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”\n\n\nDesign/methodology/approach\nThis study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.\n\n\nFindings\nThis study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.\n\n\nPractical implications\nWhen well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.\n\n\nOriginality/value\nThe uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.\n","PeriodicalId":504034,"journal":{"name":"Construction Innovation","volume":" 20","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Critical success factorsfor cost overrun minimization in public construction projects in developing countries: the case of Ghana\",\"authors\":\"Francis Nuako, F. A. Ghansah, Thomas Adusei\",\"doi\":\"10.1108/ci-07-2022-0176\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nIt is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”\\n\\n\\nDesign/methodology/approach\\nThis study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.\\n\\n\\nFindings\\nThis study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.\\n\\n\\nPractical implications\\nWhen well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.\\n\\n\\nOriginality/value\\nThe uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.\\n\",\"PeriodicalId\":504034,\"journal\":{\"name\":\"Construction Innovation\",\"volume\":\" 20\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ci-07-2022-0176\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-07-2022-0176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的 人们普遍认为,判断一个建筑项目是否成功的标准之一是看它是否在预期预算范围内完工。随着时间的推移,建筑项目的管理不断进步,但成本超支仍然是国际建筑行业的一个主要问题,尤其是在加纳等新兴经济体。本研究旨在回答以下问题:"哪些关键成功因素(CSF)有助于减少加纳建筑业公共部门基础设施项目的成本超支?"设计/方法/途径本研究采用定量调查法。为确定问卷内容的有效性,对 15 名承包商进行了访谈,对问卷进行了预先测试。研究结果本研究发现,能够减少加纳建筑项目成本超支的关键因素与五个主题直接相关:承包商尽早参与项目规划阶段、充足的资金、良好的项目团队关系、称职的经理/监理以及项目参与者激励/奖金。本研究为减少加纳公共建筑项目的成本超支确定了坚不可摧、可实证测量的重要成功标准。实际意义如果从项目启动阶段到竣工阶段都考虑周全,这些关键的成功标准还可用于应对破坏性的经济影响,如稀缺资源的分配效率低下、进一步延误、合同纠纷、索赔和诉讼、项目失败和完全放弃。独创性/价值本研究的独特之处在于,据作者所知,它是对发展中国家公共建筑项目中减少成本超支的 CSFs 的首次调查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Critical success factorsfor cost overrun minimization in public construction projects in developing countries: the case of Ghana
Purpose It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?” Design/methodology/approach This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data. Findings This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana. Practical implications When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment. Originality/value The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Construction waste reduction measures for high-rise buildings in India – a stakeholder’s perspective Industry 4.0 technologies: an examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry Critical success factors (CSFs) for the implementation of distributed ledger technology (DLT) in the Nigerian construction industry Adaptability of BIM technology to mitigate the cost overruns in design and build projects The role of interpersonal conflict as a cause of work-related stress in construction managers in Ireland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1