{"title":"在马拉维 Mulanje Mission 医院实施三相电网耦合太阳能发电和备用系统。","authors":"Arie C Glas, Michael J Cocquyt, Cathy Ratcliff","doi":"10.1177/00494755241241565","DOIUrl":null,"url":null,"abstract":"<p><p>In this report we describe the implementation of a new electricity supply system at Mulanje Mission Hospital, Malawi, which integrates the use of grid electricity, solar-generated electricity and battery back-up. To realize the system, suppliers from several countries had to be used and external expertise and funding were vital. The completed system provides reliable and good quality electricity to all departments in the hospital, prioritizing essential equipment when needed. Implementation of the system has reduced cost of electricity bills by 60%, ended black-outs and extended longevity of electrical equipment. We describe our approach, the materials used and results with challenges and recommendations to governments, donors interested in hospital infrastructure and other health facilities operating in similar circumstances. Others in similar settings can benefit from the experiences documented.</p>","PeriodicalId":49415,"journal":{"name":"Tropical Doctor","volume":" ","pages":"258-261"},"PeriodicalIF":0.5000,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC11163836/pdf/","citationCount":"0","resultStr":"{\"title\":\"Implementation of a 3-phase grid-coupled solar electricity and back-up system at Mulanje Mission Hospital, Malawi.\",\"authors\":\"Arie C Glas, Michael J Cocquyt, Cathy Ratcliff\",\"doi\":\"10.1177/00494755241241565\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>In this report we describe the implementation of a new electricity supply system at Mulanje Mission Hospital, Malawi, which integrates the use of grid electricity, solar-generated electricity and battery back-up. To realize the system, suppliers from several countries had to be used and external expertise and funding were vital. The completed system provides reliable and good quality electricity to all departments in the hospital, prioritizing essential equipment when needed. Implementation of the system has reduced cost of electricity bills by 60%, ended black-outs and extended longevity of electrical equipment. We describe our approach, the materials used and results with challenges and recommendations to governments, donors interested in hospital infrastructure and other health facilities operating in similar circumstances. Others in similar settings can benefit from the experiences documented.</p>\",\"PeriodicalId\":49415,\"journal\":{\"name\":\"Tropical Doctor\",\"volume\":\" \",\"pages\":\"258-261\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2024-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.ncbi.nlm.nih.gov/pmc/articles/PMC11163836/pdf/\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tropical Doctor\",\"FirstCategoryId\":\"3\",\"ListUrlMain\":\"https://doi.org/10.1177/00494755241241565\",\"RegionNum\":4,\"RegionCategory\":\"医学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2024/4/1 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q4\",\"JCRName\":\"PUBLIC, ENVIRONMENTAL & OCCUPATIONAL HEALTH\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tropical Doctor","FirstCategoryId":"3","ListUrlMain":"https://doi.org/10.1177/00494755241241565","RegionNum":4,"RegionCategory":"医学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2024/4/1 0:00:00","PubModel":"Epub","JCR":"Q4","JCRName":"PUBLIC, ENVIRONMENTAL & OCCUPATIONAL HEALTH","Score":null,"Total":0}
Implementation of a 3-phase grid-coupled solar electricity and back-up system at Mulanje Mission Hospital, Malawi.
In this report we describe the implementation of a new electricity supply system at Mulanje Mission Hospital, Malawi, which integrates the use of grid electricity, solar-generated electricity and battery back-up. To realize the system, suppliers from several countries had to be used and external expertise and funding were vital. The completed system provides reliable and good quality electricity to all departments in the hospital, prioritizing essential equipment when needed. Implementation of the system has reduced cost of electricity bills by 60%, ended black-outs and extended longevity of electrical equipment. We describe our approach, the materials used and results with challenges and recommendations to governments, donors interested in hospital infrastructure and other health facilities operating in similar circumstances. Others in similar settings can benefit from the experiences documented.
期刊介绍:
The only journal written by and for health workers in low and middle-income countries, Tropical Doctor provides medical expertise and practical advice on how to apply current medical knowledge to the special circumstances of LMIC countries. This journal provides an ideal forum for sharing experiences and establishing best practice, aiding communication between medical professionals in different environments.