论高层建筑工程中的技术管理要点

Jie Jin
{"title":"论高层建筑工程中的技术管理要点","authors":"Jie Jin","doi":"10.54691/gy2car84","DOIUrl":null,"url":null,"abstract":"For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.","PeriodicalId":476071,"journal":{"name":"Frontiers in Humanities and Social Sciences","volume":"22 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On the Key Points of Technical Management in High rise Building Engineering\",\"authors\":\"Jie Jin\",\"doi\":\"10.54691/gy2car84\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.\",\"PeriodicalId\":476071,\"journal\":{\"name\":\"Frontiers in Humanities and Social Sciences\",\"volume\":\"22 4\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Frontiers in Humanities and Social Sciences\",\"FirstCategoryId\":\"0\",\"ListUrlMain\":\"https://doi.org/10.54691/gy2car84\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers in Humanities and Social Sciences","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.54691/gy2car84","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

对于高层建筑施工项目的技术管理而言,它涉及整个施工过程的系统化方法。施工前阶段需要从选址到市场分析进行精心规划,而工程设计则要确保结构的完整性和功能的高效性。在施工阶段,高效的项目组织、采购和现场管理以及严格的质量控制至关重要。施工后阶段的重点是调试、无缝移交以及设施的持续运行和维护。总之,通过采用全面的技术管理,确保了高层建筑施工的安全和高效,既满足了功能和美学要求,又兼顾了环境保护。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
On the Key Points of Technical Management in High rise Building Engineering
For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Vegetative Imagery and Emotional Expression: Symbolism and Heritage of Plant Imagery in Chinese Classical Poetry Research on the Transformation of Traditional Commercial Banks Based on the Perspective of Financial Technology Research on the mechanism and policies of polycentric agglomeration for promoting the upgrading of China's position in the global production value chain Research on the Coupled and Coordinated Development and Optimization Path of Low Carbon Economy and New Urbanization Based on the west, training high-quality innovative accounting talents in petroleum colleges and universities
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1