巴里曼丹省悬索桥建设成本分析

Usman Yasin, Elvira Elvira, Lusiana Lusiana, Herwani Herwani
{"title":"巴里曼丹省悬索桥建设成本分析","authors":"Usman Yasin, Elvira Elvira, Lusiana Lusiana, Herwani Herwani","doi":"10.26418/jts.v24i1.72224","DOIUrl":null,"url":null,"abstract":"The successful implementation of a job begins with the determination of a reliable estimation value. One of the models used in determining the estimated value of a job, using data from the cost budget plan (RAB) on work that has been carried out, is the Cost Significant Model.  In this study, the data used were five suspension bridge construction jobs starting from 2018 to 2022. the data obtained from the RAB is processed into independent variables and dependent variables, which are then tested using multiple linear regression methods using the SPSS application. Based on the results of the analysis, the influential variables are X2, namely Bridge Oprit Work; X4, namely Upper Building Work (Transportation and Installation of Truss Bridges); and X5, namely Lower Building Work (Angkur Block Work, Pyilon Foundations, Wind Ties) with a total weight of 85.30%.  By using the equation Y = -21,640,343,680,000 + (1,856,843,372 x X2) + (453,953,095 x X4) + (41,965,201,370 x X5), the maximum value of 62.21% and minimum value of -98.05% are obtained, so it falls into the Class 5 category. Class 5 has an accuracy value ranging from +30% to +100%, so it is estimated that it is feasible to use it to carry out the initial concept screening estimation.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COST ANALYSIS OF SUSPENSION BRIDGE CONSTRUCTION IN KALIMANTAN BARAT PROVINCE\",\"authors\":\"Usman Yasin, Elvira Elvira, Lusiana Lusiana, Herwani Herwani\",\"doi\":\"10.26418/jts.v24i1.72224\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The successful implementation of a job begins with the determination of a reliable estimation value. One of the models used in determining the estimated value of a job, using data from the cost budget plan (RAB) on work that has been carried out, is the Cost Significant Model.  In this study, the data used were five suspension bridge construction jobs starting from 2018 to 2022. the data obtained from the RAB is processed into independent variables and dependent variables, which are then tested using multiple linear regression methods using the SPSS application. Based on the results of the analysis, the influential variables are X2, namely Bridge Oprit Work; X4, namely Upper Building Work (Transportation and Installation of Truss Bridges); and X5, namely Lower Building Work (Angkur Block Work, Pyilon Foundations, Wind Ties) with a total weight of 85.30%.  By using the equation Y = -21,640,343,680,000 + (1,856,843,372 x X2) + (453,953,095 x X4) + (41,965,201,370 x X5), the maximum value of 62.21% and minimum value of -98.05% are obtained, so it falls into the Class 5 category. Class 5 has an accuracy value ranging from +30% to +100%, so it is estimated that it is feasible to use it to carry out the initial concept screening estimation.\",\"PeriodicalId\":52838,\"journal\":{\"name\":\"Jurnal Teknik Sipil\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26418/jts.v24i1.72224\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v24i1.72224","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

要成功实施一项工作,首先要确定一个可靠的估算值。利用成本预算计划(RAB)中已实施工程的数据来确定一项工作的估算值,其中一个模型就是成本显著模型。 在本研究中,使用的数据是从 2018 年开始到 2022 年的五项悬索桥施工工作。从 RAB 中获得的数据被处理成自变量和因变量,然后使用 SPSS 应用程序,使用多元线性回归方法对其进行检验。根据分析结果,影响变量为 X2,即桥梁工程;X4,即上部建筑工程(桁架桥的运输和安装);X5,即下部建筑工程(Angkur Block 工程、Pyilon 基础、防风拉杆),总权重为 85.30%。 根据公式 Y = -21,640,343,680,000 + (1,856,843,372 x X2) + (453,953,095 x X4) + (41,965,201,370 x X5),得出最大值为 62.21%,最小值为 -98.05%,因此属于 5 级。第 5 类的准确度值在 +30% 到 +100% 之间,因此估计用它来进行初步概念筛选估算是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
COST ANALYSIS OF SUSPENSION BRIDGE CONSTRUCTION IN KALIMANTAN BARAT PROVINCE
The successful implementation of a job begins with the determination of a reliable estimation value. One of the models used in determining the estimated value of a job, using data from the cost budget plan (RAB) on work that has been carried out, is the Cost Significant Model.  In this study, the data used were five suspension bridge construction jobs starting from 2018 to 2022. the data obtained from the RAB is processed into independent variables and dependent variables, which are then tested using multiple linear regression methods using the SPSS application. Based on the results of the analysis, the influential variables are X2, namely Bridge Oprit Work; X4, namely Upper Building Work (Transportation and Installation of Truss Bridges); and X5, namely Lower Building Work (Angkur Block Work, Pyilon Foundations, Wind Ties) with a total weight of 85.30%.  By using the equation Y = -21,640,343,680,000 + (1,856,843,372 x X2) + (453,953,095 x X4) + (41,965,201,370 x X5), the maximum value of 62.21% and minimum value of -98.05% are obtained, so it falls into the Class 5 category. Class 5 has an accuracy value ranging from +30% to +100%, so it is estimated that it is feasible to use it to carry out the initial concept screening estimation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
PLANNING FOR THE DEVELOPMENT OF A DRINKING WATER DISTRIBUTION SYSTEM NETWORK IN SUNGAI PINYUH DETERMINATION OF DISCHARGE COEFFICIENT THROUGH LABORATORY TESTING USING BROAD-CRESTED WEIR DETERMINATION OF REPRESENTATIVE MOCK MODEL PARAMETERS FOR MONTHLY DISCHARGE CURVE DEVELOPMENT IN THE UPPER KAPUAS RIVER BASIN FLOW HYDROGRAPH GENERATION FOR MELAWI SUB-WATERSHED USING THE SNYDER SYNTHETIC UNIT HYDROGRAPH MODEL BRACKISH WATER DESALINATION IN SUNGAI ITIK AREA USING REVERSE OSMOSIS (RO) METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1