Igor' Golovanov, Ilia Gusev, Regina Nefedova, Sergey Nefedova
{"title":"对伊尔库茨克州输电线路进行现代化改造以提高输送能力","authors":"Igor' Golovanov, Ilia Gusev, Regina Nefedova, Sergey Nefedova","doi":"10.36629/2686-9896-2024-1-238-239","DOIUrl":null,"url":null,"abstract":"The issue of increasing the capacity of power transmission lines (PTL) during the modernization of power supply systems of the Irkutsk region using power transmission lines manufactured using Aero-Z technology is considered","PeriodicalId":118758,"journal":{"name":"Modern Technologies and Scientific and Technological Progress","volume":"18 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"MODERNIZATION OF POWER TRANSMISSION LINES IN THE IRKUTSK REGION TO INCREASE THROUGHPUT CAPACITY\",\"authors\":\"Igor' Golovanov, Ilia Gusev, Regina Nefedova, Sergey Nefedova\",\"doi\":\"10.36629/2686-9896-2024-1-238-239\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The issue of increasing the capacity of power transmission lines (PTL) during the modernization of power supply systems of the Irkutsk region using power transmission lines manufactured using Aero-Z technology is considered\",\"PeriodicalId\":118758,\"journal\":{\"name\":\"Modern Technologies and Scientific and Technological Progress\",\"volume\":\"18 9\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modern Technologies and Scientific and Technological Progress\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36629/2686-9896-2024-1-238-239\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern Technologies and Scientific and Technological Progress","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36629/2686-9896-2024-1-238-239","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
MODERNIZATION OF POWER TRANSMISSION LINES IN THE IRKUTSK REGION TO INCREASE THROUGHPUT CAPACITY
The issue of increasing the capacity of power transmission lines (PTL) during the modernization of power supply systems of the Irkutsk region using power transmission lines manufactured using Aero-Z technology is considered