{"title":"结合层次分析法、模糊专家系统和指数风险优先数,对制造业创新项目进行整体评估","authors":"Quirin Gärtner, Alessandro Bianchi, Harsh Mulrav, Gunther Reinhart","doi":"10.1080/21693277.2024.2378200","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":507765,"journal":{"name":"Production & Manufacturing Research","volume":"9 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Combining the analytical hierarchy process, fuzzy expert systems, and the exponential risk priority number for the holistic evaluation of innovation projects in manufacturing\",\"authors\":\"Quirin Gärtner, Alessandro Bianchi, Harsh Mulrav, Gunther Reinhart\",\"doi\":\"10.1080/21693277.2024.2378200\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":507765,\"journal\":{\"name\":\"Production & Manufacturing Research\",\"volume\":\"9 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production & Manufacturing Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/21693277.2024.2378200\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production & Manufacturing Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/21693277.2024.2378200","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Combining the analytical hierarchy process, fuzzy expert systems, and the exponential risk priority number for the holistic evaluation of innovation projects in manufacturing