{"title":"无线网络传输和建筑信息模型技术研究","authors":"Feng Qiao","doi":"10.4018/ijismd.347218","DOIUrl":null,"url":null,"abstract":"In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.","PeriodicalId":42831,"journal":{"name":"International Journal of Information System Modeling and Design","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2024-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Wireless Network Transmission and Building Information Model Technologies\",\"authors\":\"Feng Qiao\",\"doi\":\"10.4018/ijismd.347218\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.\",\"PeriodicalId\":42831,\"journal\":{\"name\":\"International Journal of Information System Modeling and Design\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2024-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Information System Modeling and Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijismd.347218\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"COMPUTER SCIENCE, INFORMATION SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Information System Modeling and Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijismd.347218","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, INFORMATION SYSTEMS","Score":null,"Total":0}
Research on Wireless Network Transmission and Building Information Model Technologies
In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.