无线网络传输和建筑信息模型技术研究

IF 0.8 Q4 COMPUTER SCIENCE, INFORMATION SYSTEMS International Journal of Information System Modeling and Design Pub Date : 2024-07-17 DOI:10.4018/ijismd.347218
Feng Qiao
{"title":"无线网络传输和建筑信息模型技术研究","authors":"Feng Qiao","doi":"10.4018/ijismd.347218","DOIUrl":null,"url":null,"abstract":"In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.","PeriodicalId":42831,"journal":{"name":"International Journal of Information System Modeling and Design","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2024-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Wireless Network Transmission and Building Information Model Technologies\",\"authors\":\"Feng Qiao\",\"doi\":\"10.4018/ijismd.347218\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.\",\"PeriodicalId\":42831,\"journal\":{\"name\":\"International Journal of Information System Modeling and Design\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2024-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Information System Modeling and Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijismd.347218\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"COMPUTER SCIENCE, INFORMATION SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Information System Modeling and Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijismd.347218","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, INFORMATION SYSTEMS","Score":null,"Total":0}
引用次数: 0

摘要

在建筑管理中,可以在生产过程中实时传输大量信息,从而有助于建筑材料的组织和管理。通过抽样调查和沙盘模拟,将基于 BIM(建筑信息模型)的建筑材料管理与传统管理方法和 BIM 与无线网络通信相结合的管理方法进行比较,从而更好地了解建筑材料的管理方法。本研究评估了施工阶段材料的采购、储存和质量,以及项目开发不同阶段不同技术方法在材料管理方面的差异。结果显示,基于 BIM 的管理方法的平均库存周转率是传统管理方法的 6 倍,而后者是前者的 4 倍。另一方面,将 BIM 与无线网络通信相结合可以产生更好的效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research on Wireless Network Transmission and Building Information Model Technologies
In the construction management, it is possible to transmit large amounts of information in real-time during manufacturing, which can aid in the organization and administration of building materials. Through sampling survey and sand table simulation, the management of building materials based on BIM (Building Information Model) is compared with the traditional management method and the management method combining BIM with wireless network communication, so as to better understand the management method for building materials. This study evaluates the purchase, storage and quality of materials during the construction stage, and the differences in material management between different technical methods at different stages of the project development. According to the results, the average inventory turnover rate of the BIM-based management approach is six times higher than that of conventional management method, while the latter is four times higher. On the other hand, combining BIM with wireless network communication can produce better effects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.20
自引率
0.00%
发文量
31
期刊最新文献
Art Design of Non-Heritage Cultural and Creative Products Based on the Concept of Sustainability Research on Wireless Network Transmission and Building Information Model Technologies Development of Multimedia-Assisted Clothing Try-On System for Elderly Individuals Construction and Implementation of Content-Based National Music Retrieval Model Under Deep Learning Automatic Test Sequence Generation and Functional Coverage Measurement From UML Sequence Diagrams
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1