纽伦堡新引渡桥的设计与组装

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3058
Thomas Klähne, Mike Owusu-Yeboah, Matthias Weißbach
{"title":"纽伦堡新引渡桥的设计与组装","authors":"Thomas Klähne,&nbsp;Mike Owusu-Yeboah,&nbsp;Matthias Weißbach","doi":"10.1002/cepa.3058","DOIUrl":null,"url":null,"abstract":"<p>A ramp structure with a length of 588 m was planned in the area of the Nuremberg East interchange between the A9 and A6 highways. The bridge structure is an extradosed bridge, which represents an unusual technical and design solution for a ramp structure in Germany for reasons of maintaining traffic. The structure is preassembled in incremental sections, fitted with the cables and incrementally lengthwise inserted. In addition to the design and assembly, the article also reports on structural design aspects.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design and assembly of a new extradosed bridge in Nuremberg\",\"authors\":\"Thomas Klähne,&nbsp;Mike Owusu-Yeboah,&nbsp;Matthias Weißbach\",\"doi\":\"10.1002/cepa.3058\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>A ramp structure with a length of 588 m was planned in the area of the Nuremberg East interchange between the A9 and A6 highways. The bridge structure is an extradosed bridge, which represents an unusual technical and design solution for a ramp structure in Germany for reasons of maintaining traffic. The structure is preassembled in incremental sections, fitted with the cables and incrementally lengthwise inserted. In addition to the design and assembly, the article also reports on structural design aspects.</p>\",\"PeriodicalId\":100223,\"journal\":{\"name\":\"ce/papers\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ce/papers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3058\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在 A9 和 A6 高速公路之间的纽伦堡东交汇处,规划了一个长 588 米的匝道结构。该桥梁结构是一座分离式桥梁,在德国,出于维护交通的考虑,这是一种不同寻常的匝道结构技术和设计方案。该结构是分段预组装的,安装了电缆并按长度方向逐步插入。除了设计和组装,文章还报告了结构设计方面的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design and assembly of a new extradosed bridge in Nuremberg

A ramp structure with a length of 588 m was planned in the area of the Nuremberg East interchange between the A9 and A6 highways. The bridge structure is an extradosed bridge, which represents an unusual technical and design solution for a ramp structure in Germany for reasons of maintaining traffic. The structure is preassembled in incremental sections, fitted with the cables and incrementally lengthwise inserted. In addition to the design and assembly, the article also reports on structural design aspects.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Issue Information Reliability-based Allowances of Corrosion Losses for Weathering Steel Bridges Failure mode and load prediction of steel bridge girders through 3D laser scanning and machine learning methods ‘Robinson’ Pedestrian Bridge in Budapest, Hungary Cable-stayed footbridge in Lover Vítkovice Area-DOV
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1