{"title":"在有预选系统的情况下,井口尺寸和截留品位对地下采矿作业的设计和进度安排的影响","authors":"Farzad Sotoudeh, Micah Nehring, Mehmet Kizil, Peter Knights, Amin Mousavi","doi":"10.1080/17480930.2024.2387989","DOIUrl":null,"url":null,"abstract":"Stope layout optimisation is considered one of the main steps in the design and strategic planning of underground mining operations. This paper investigates the influence of stope size and cut-off ...","PeriodicalId":49180,"journal":{"name":"International Journal of Mining Reclamation and Environment","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2024-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The effect of stope size and cut-off grade on the design and scheduling of an underground mining operation in the presence of a pre-concentration system\",\"authors\":\"Farzad Sotoudeh, Micah Nehring, Mehmet Kizil, Peter Knights, Amin Mousavi\",\"doi\":\"10.1080/17480930.2024.2387989\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stope layout optimisation is considered one of the main steps in the design and strategic planning of underground mining operations. This paper investigates the influence of stope size and cut-off ...\",\"PeriodicalId\":49180,\"journal\":{\"name\":\"International Journal of Mining Reclamation and Environment\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2024-08-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining Reclamation and Environment\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/17480930.2024.2387989\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENVIRONMENTAL SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining Reclamation and Environment","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/17480930.2024.2387989","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
The effect of stope size and cut-off grade on the design and scheduling of an underground mining operation in the presence of a pre-concentration system
Stope layout optimisation is considered one of the main steps in the design and strategic planning of underground mining operations. This paper investigates the influence of stope size and cut-off ...
期刊介绍:
The International Journal of Mining, Reclamation and Environment published research on mining and environmental technology engineering relating to metalliferous deposits, coal, oil sands, and industrial minerals.
We welcome environmental mining research papers that explore:
-Mining environmental impact assessment and permitting-
Mining and processing technologies-
Mining waste management and waste minimization practices in mining-
Mine site closure-
Mining decommissioning and reclamation-
Acid mine drainage.
The International Journal of Mining, Reclamation and Environment welcomes mining research papers that explore:
-Design of surface and underground mines (economics, geotechnical, production scheduling, ventilation)-
Mine planning and optimization-
Mining geostatics-
Mine drilling and blasting technologies-
Mining material handling systems-
Mine equipment