{"title":"开发随机过程模型控制周期规划算法","authors":"O. Hrechanyі","doi":"10.1016/j.rineng.2024.102964","DOIUrl":null,"url":null,"abstract":"<div><div>The problem of forecasting the beginning of the repair effects of equipment under the action of degradation processes was considered. The possibility of using the theory of emissions that form a non-stationary Poisson flow to establish the inspection interval was studied. It was found that when using the theory of emissions while assigning inter-control periods, it is necessary to compare paired correlation coefficients, one of which is <em>r</em><sub><em>1,δ</em></sub>≫0.9 and tends to unity.</div></div>","PeriodicalId":36919,"journal":{"name":"Results in Engineering","volume":"24 ","pages":"Article 102964"},"PeriodicalIF":6.0000,"publicationDate":"2024-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2590123024012192/pdfft?md5=ae683fc3db98698089e553a35ccb5c5f&pid=1-s2.0-S2590123024012192-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Developing an algorithm for planning the periodicity of controls for a random process model\",\"authors\":\"O. Hrechanyі\",\"doi\":\"10.1016/j.rineng.2024.102964\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The problem of forecasting the beginning of the repair effects of equipment under the action of degradation processes was considered. The possibility of using the theory of emissions that form a non-stationary Poisson flow to establish the inspection interval was studied. It was found that when using the theory of emissions while assigning inter-control periods, it is necessary to compare paired correlation coefficients, one of which is <em>r</em><sub><em>1,δ</em></sub>≫0.9 and tends to unity.</div></div>\",\"PeriodicalId\":36919,\"journal\":{\"name\":\"Results in Engineering\",\"volume\":\"24 \",\"pages\":\"Article 102964\"},\"PeriodicalIF\":6.0000,\"publicationDate\":\"2024-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2590123024012192/pdfft?md5=ae683fc3db98698089e553a35ccb5c5f&pid=1-s2.0-S2590123024012192-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Results in Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2590123024012192\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Results in Engineering","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2590123024012192","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
Developing an algorithm for planning the periodicity of controls for a random process model
The problem of forecasting the beginning of the repair effects of equipment under the action of degradation processes was considered. The possibility of using the theory of emissions that form a non-stationary Poisson flow to establish the inspection interval was studied. It was found that when using the theory of emissions while assigning inter-control periods, it is necessary to compare paired correlation coefficients, one of which is r1,δ≫0.9 and tends to unity.