用价值流图分析工业模板系统供应链

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2022-01-01 DOI:10.32738/jeppm-2022-0005
Taylan Terzioglu, Gul Polat, Harun Turkoglu
{"title":"用价值流图分析工业模板系统供应链","authors":"Taylan Terzioglu, Gul Polat, Harun Turkoglu","doi":"10.32738/jeppm-2022-0005","DOIUrl":null,"url":null,"abstract":"Reinforced concrete (RC) is used as the primary structural material in almost all construction projects worldwide, from infrastructure to building projects. Since formwork is an essential part of RC construction supply chain, it has a significant impact on the project performance. In the industrial formwork systems supply chain, the roles and responsibilities of the main stakeholders (e.g., engineer, contractor, formwork fabricator) at various phases of the project can be represented by different supply chain configurations (SCCs). The objectives of this study are to identify different SCCs for industrial formwork systems in the Turkish RC construction industry and to analyze the identified SCCs using value stream mapping (VSM) method, which is an effective and major lean tool for identifying and eliminating waste. For this purpose, first, three SCCs for industrial formwork systems have been identified, which are predominantly used in Turkey. Then, these configurations were analyzed through VSM method on an ongoing building project where 500 m2 of industrial wall formwork would be used as a real-life case study. The analysis results indicated that the SCC with the early involvement of the formwork fabricator (FWF) had higher performance than other SCCs, which is consistent with a lean construction approach.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Analysis of Industrial Formwork Systems Supply Chain Using Value Stream Mapping\",\"authors\":\"Taylan Terzioglu, Gul Polat, Harun Turkoglu\",\"doi\":\"10.32738/jeppm-2022-0005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reinforced concrete (RC) is used as the primary structural material in almost all construction projects worldwide, from infrastructure to building projects. Since formwork is an essential part of RC construction supply chain, it has a significant impact on the project performance. In the industrial formwork systems supply chain, the roles and responsibilities of the main stakeholders (e.g., engineer, contractor, formwork fabricator) at various phases of the project can be represented by different supply chain configurations (SCCs). The objectives of this study are to identify different SCCs for industrial formwork systems in the Turkish RC construction industry and to analyze the identified SCCs using value stream mapping (VSM) method, which is an effective and major lean tool for identifying and eliminating waste. For this purpose, first, three SCCs for industrial formwork systems have been identified, which are predominantly used in Turkey. Then, these configurations were analyzed through VSM method on an ongoing building project where 500 m2 of industrial wall formwork would be used as a real-life case study. The analysis results indicated that the SCC with the early involvement of the formwork fabricator (FWF) had higher performance than other SCCs, which is consistent with a lean construction approach.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32738/jeppm-2022-0005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 4

摘要

从基础设施到建筑工程,世界上几乎所有的建筑工程都使用钢筋混凝土(RC)作为主要结构材料。由于模板是钢筋混凝土建筑供应链的重要组成部分,它对项目绩效有重大影响。在工业模板系统供应链中,项目各个阶段的主要利益相关者(如工程师、承包商、模板制造商)的角色和责任可以用不同的供应链配置(scc)来表示。本研究的目的是确定土耳其钢筋混凝土建筑行业工业模板系统的不同SCCs,并使用价值流映射(VSM)方法分析已确定的SCCs,价值流映射(VSM)方法是识别和消除浪费的有效和主要精益工具。为此,首先,已经确定了用于工业模板系统的三个SCCs,它们主要在土耳其使用。然后,在一个正在进行的建筑项目中,通过VSM方法对这些配置进行分析,该项目将使用500平方米的工业墙模板作为现实案例研究。分析结果表明,早期模板制造商(FWF)参与的SCC比其他SCC具有更高的性能,这与精益施工方法是一致的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis of Industrial Formwork Systems Supply Chain Using Value Stream Mapping
Reinforced concrete (RC) is used as the primary structural material in almost all construction projects worldwide, from infrastructure to building projects. Since formwork is an essential part of RC construction supply chain, it has a significant impact on the project performance. In the industrial formwork systems supply chain, the roles and responsibilities of the main stakeholders (e.g., engineer, contractor, formwork fabricator) at various phases of the project can be represented by different supply chain configurations (SCCs). The objectives of this study are to identify different SCCs for industrial formwork systems in the Turkish RC construction industry and to analyze the identified SCCs using value stream mapping (VSM) method, which is an effective and major lean tool for identifying and eliminating waste. For this purpose, first, three SCCs for industrial formwork systems have been identified, which are predominantly used in Turkey. Then, these configurations were analyzed through VSM method on an ongoing building project where 500 m2 of industrial wall formwork would be used as a real-life case study. The analysis results indicated that the SCC with the early involvement of the formwork fabricator (FWF) had higher performance than other SCCs, which is consistent with a lean construction approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1