{"title":"马来西亚工程机械租用率偏差:通货膨胀率影响分析","authors":"M. A. Musarat, W. Alaloul, M. S. Liew","doi":"10.7764/RDLC.20.1.91","DOIUrl":null,"url":null,"abstract":"Machinery has been used in the construction industry in both small and large scale projects for a long time. Machinery is one of the main components of any construction projects and rates deviation within the hiring of the machinery can result in cost overrun of the project. To deal with the issue of deviating the machinery hire rates in the construction industry, this study has been conducted. The study accesses the machinery hire rates and aims to investigate the percentage deviation from 2013 to 2018, where statistical analysis was performed to identify the influence of the inflation rate in deviating the machinery hire which results in cost overrun. The analysis shows that the inflation rate possesses a weak relationship with nine of the machinery hire rates, where five shows a moderate relationship. It is therefore recommended to observe other factors which deviate the machinery hire rates within the construction industry.","PeriodicalId":54473,"journal":{"name":"Revista de la Construccion","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2021-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Construction machinery hire rates deviation in Malaysia: an inflation rate effect analysis\",\"authors\":\"M. A. Musarat, W. Alaloul, M. S. Liew\",\"doi\":\"10.7764/RDLC.20.1.91\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Machinery has been used in the construction industry in both small and large scale projects for a long time. Machinery is one of the main components of any construction projects and rates deviation within the hiring of the machinery can result in cost overrun of the project. To deal with the issue of deviating the machinery hire rates in the construction industry, this study has been conducted. The study accesses the machinery hire rates and aims to investigate the percentage deviation from 2013 to 2018, where statistical analysis was performed to identify the influence of the inflation rate in deviating the machinery hire which results in cost overrun. The analysis shows that the inflation rate possesses a weak relationship with nine of the machinery hire rates, where five shows a moderate relationship. It is therefore recommended to observe other factors which deviate the machinery hire rates within the construction industry.\",\"PeriodicalId\":54473,\"journal\":{\"name\":\"Revista de la Construccion\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2021-04-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista de la Construccion\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7764/RDLC.20.1.91\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de la Construccion","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7764/RDLC.20.1.91","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Construction machinery hire rates deviation in Malaysia: an inflation rate effect analysis
Machinery has been used in the construction industry in both small and large scale projects for a long time. Machinery is one of the main components of any construction projects and rates deviation within the hiring of the machinery can result in cost overrun of the project. To deal with the issue of deviating the machinery hire rates in the construction industry, this study has been conducted. The study accesses the machinery hire rates and aims to investigate the percentage deviation from 2013 to 2018, where statistical analysis was performed to identify the influence of the inflation rate in deviating the machinery hire which results in cost overrun. The analysis shows that the inflation rate possesses a weak relationship with nine of the machinery hire rates, where five shows a moderate relationship. It is therefore recommended to observe other factors which deviate the machinery hire rates within the construction industry.
期刊介绍:
The Journal of Construction is aimed at professionals, constructors, academics, researchers, companies, architects, engineers, and anyone who wishes to expand and update their knowledge about construction. We therefore invite all researchers, academics, and professionals to send their contributions for assessment and possible publication in this journal. The publications are free of publication charges.
OBJECTIVES
The objectives of the Journal of Construction are:
1. To disseminate new knowledge in all areas related to construction (Building, Civil Works, Materials, Business, Education, etc.).
2. To provide professionals in the area with material for discussion to refresh and update their knowledge.
3. To disseminate new applied technologies in construction nationally and internationally.
4. To provide national and foreign academics with an internationally endorsed medium in which to share their knowledge and debate the topics raised.