{"title":"布拉格历史桥梁的修复工程","authors":"I. Broukalová, V. Krístek","doi":"10.3846/BJRBE.2017.33","DOIUrl":null,"url":null,"abstract":"The recent reconstruction of the historical masonry Charles Bridge in Prague was designed with respect to original conception, materials and ancient construction techniques. The repair and remedial works were based on analysis of the multi-decade response of the bridge, diagnosis, and assessment of damages, failures and deterioration processes related to materials, environment, climate, structural arrangement and detailing regarding heritage, historical and structural aspects. The gentle way of remedial works with minimal intervention in the loadbearing structure is a result of a wide-range discussion on appropriate strategies for refurbishment, restoration, conservation and preservation corresponding to location and significance of the historic bridge. The reconstruction increased durability and provides a long service life of the historical bridge and protection against harmful effects for many years to come. The article outlines historical data, consequences of the controversial reconstruction in the second half of the last century. Effects of river flow, temperature, and moisture and their influence on needful repairs are considered. Stages of reconstruction are presented; in the first stage, strengthening of foundations of bridge piers is described including historical background and impact of river flow on subgrade of piers. Ways of repairs and reconstruction of the bridge deck, its draining, and other related bridge elements are shown as a part of the second stage of reconstruction.","PeriodicalId":55402,"journal":{"name":"Baltic Journal of Road and Bridge Engineering","volume":"12 1","pages":"264-269"},"PeriodicalIF":0.6000,"publicationDate":"2017-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Remedial Works and Repairs of Historical Bridge in Prague\",\"authors\":\"I. Broukalová, V. Krístek\",\"doi\":\"10.3846/BJRBE.2017.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The recent reconstruction of the historical masonry Charles Bridge in Prague was designed with respect to original conception, materials and ancient construction techniques. The repair and remedial works were based on analysis of the multi-decade response of the bridge, diagnosis, and assessment of damages, failures and deterioration processes related to materials, environment, climate, structural arrangement and detailing regarding heritage, historical and structural aspects. The gentle way of remedial works with minimal intervention in the loadbearing structure is a result of a wide-range discussion on appropriate strategies for refurbishment, restoration, conservation and preservation corresponding to location and significance of the historic bridge. The reconstruction increased durability and provides a long service life of the historical bridge and protection against harmful effects for many years to come. The article outlines historical data, consequences of the controversial reconstruction in the second half of the last century. Effects of river flow, temperature, and moisture and their influence on needful repairs are considered. Stages of reconstruction are presented; in the first stage, strengthening of foundations of bridge piers is described including historical background and impact of river flow on subgrade of piers. Ways of repairs and reconstruction of the bridge deck, its draining, and other related bridge elements are shown as a part of the second stage of reconstruction.\",\"PeriodicalId\":55402,\"journal\":{\"name\":\"Baltic Journal of Road and Bridge Engineering\",\"volume\":\"12 1\",\"pages\":\"264-269\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2017-12-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Baltic Journal of Road and Bridge Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.3846/BJRBE.2017.33\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Baltic Journal of Road and Bridge Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3846/BJRBE.2017.33","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Remedial Works and Repairs of Historical Bridge in Prague
The recent reconstruction of the historical masonry Charles Bridge in Prague was designed with respect to original conception, materials and ancient construction techniques. The repair and remedial works were based on analysis of the multi-decade response of the bridge, diagnosis, and assessment of damages, failures and deterioration processes related to materials, environment, climate, structural arrangement and detailing regarding heritage, historical and structural aspects. The gentle way of remedial works with minimal intervention in the loadbearing structure is a result of a wide-range discussion on appropriate strategies for refurbishment, restoration, conservation and preservation corresponding to location and significance of the historic bridge. The reconstruction increased durability and provides a long service life of the historical bridge and protection against harmful effects for many years to come. The article outlines historical data, consequences of the controversial reconstruction in the second half of the last century. Effects of river flow, temperature, and moisture and their influence on needful repairs are considered. Stages of reconstruction are presented; in the first stage, strengthening of foundations of bridge piers is described including historical background and impact of river flow on subgrade of piers. Ways of repairs and reconstruction of the bridge deck, its draining, and other related bridge elements are shown as a part of the second stage of reconstruction.
期刊介绍:
THE JOURNAL IS DESIGNED FOR PUBLISHING PAPERS CONCERNING THE FOLLOWING AREAS OF RESEARCH:
road and bridge research and design,
road construction materials and technologies,
bridge construction materials and technologies,
road and bridge repair,
road and bridge maintenance,
traffic safety,
road and bridge information technologies,
environmental issues,
road climatology,
low-volume roads,
normative documentation,
quality management and assurance,
road infrastructure and its assessment,
asset management,
road and bridge construction financing,
specialist pre-service and in-service training;