公共部门在建设项目中实施建筑信息建模的能力改进措施

A. Yusuf, A. Opawole, N. A. Musa, D. S. Kadiri, E. Ebunoluwa
{"title":"公共部门在建设项目中实施建筑信息建模的能力改进措施","authors":"A. Yusuf, A. Opawole, N. A. Musa, D. S. Kadiri, E. Ebunoluwa","doi":"10.2478/otmcj-2022-0014","DOIUrl":null,"url":null,"abstract":"Abstract This study examines the capability improvement measures of the public sector client for enhancing the implementation of building information modeling (BIM) in construction project delivery. The study adopted a quantitative descriptive analysis based on primary data obtained through a structured questionnaire. A total of 198 valid questionnaires obtained from construction professionals within public sector organizations in Lagos State, Nigeria, provided primary quantitative data for the assessment. Data collected were analyzed using descriptive and inferential statistics. The findings indicated the measures to enhance the capacity of the public sector for BIM implementation including the following: team-based structure and recruitment of adequate number of staff (with mean score [MS] = 3.66), government support and involvement (MS = 3.64), government policies, adoption of process open to innovation, and investment in equipment and technology (MS = 3.60) had been considerably entrenched. However, measures that resulted in improved efficiency were limited to the following: reward system for performance (MS = 3.81), government policies, and education and training of staff (MS = 3.74), government support and involvement (MS = 3.73), and clear job description (MS = 3.71). Most of the measures with high level of impact were not necessarily those that are frequently used. On this basis, the public sector needs to differ from the status quo by adopting improvement measures that are appropriate for enhancing its capabilities for BIM in project delivery. The findings indicate implications that could enable the public sector to adjust and make necessary policies in a bid to improve BIM implementation in project delivery.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2710 - 2730"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Capability improvement measures of the public sector for implementation of building information modeling in construction projects\",\"authors\":\"A. Yusuf, A. Opawole, N. A. Musa, D. S. Kadiri, E. Ebunoluwa\",\"doi\":\"10.2478/otmcj-2022-0014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract This study examines the capability improvement measures of the public sector client for enhancing the implementation of building information modeling (BIM) in construction project delivery. The study adopted a quantitative descriptive analysis based on primary data obtained through a structured questionnaire. A total of 198 valid questionnaires obtained from construction professionals within public sector organizations in Lagos State, Nigeria, provided primary quantitative data for the assessment. Data collected were analyzed using descriptive and inferential statistics. The findings indicated the measures to enhance the capacity of the public sector for BIM implementation including the following: team-based structure and recruitment of adequate number of staff (with mean score [MS] = 3.66), government support and involvement (MS = 3.64), government policies, adoption of process open to innovation, and investment in equipment and technology (MS = 3.60) had been considerably entrenched. However, measures that resulted in improved efficiency were limited to the following: reward system for performance (MS = 3.81), government policies, and education and training of staff (MS = 3.74), government support and involvement (MS = 3.73), and clear job description (MS = 3.71). Most of the measures with high level of impact were not necessarily those that are frequently used. On this basis, the public sector needs to differ from the status quo by adopting improvement measures that are appropriate for enhancing its capabilities for BIM in project delivery. The findings indicate implications that could enable the public sector to adjust and make necessary policies in a bid to improve BIM implementation in project delivery.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"14 1\",\"pages\":\"2710 - 2730\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2022-0014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

摘要

摘要本研究考察了公共部门客户在建设项目交付中加强建筑信息建模(BIM)实施的能力改进措施。该研究采用了定量描述性分析,基于通过结构化问卷获得的原始数据。从尼日利亚拉各斯州公共部门组织的建筑专业人员那里获得的198份有效问卷为评估提供了初步的定量数据。使用描述性和推断统计学对收集的数据进行分析。研究结果表明,提高公共部门BIM实施能力的措施包括:基于团队的结构和招聘足够数量的员工(平均得分[MS]=3.66)、政府支持和参与(MS=3.64)、政府政策、采用开放式创新流程、,对设备和技术的投资(MS=3.60)已经相当稳固。然而,提高效率的措施仅限于以下方面:绩效奖励制度(MS=3.81)、政府政策、员工教育和培训(MS=3.74)、政府支持和参与(MS=3.33)以及明确的工作描述(MS=3.75)。大多数影响程度高的措施不一定是经常使用的措施。在此基础上,公共部门需要与现状不同,采取适当的改进措施,以提高其在项目交付中的BIM能力。研究结果表明,公共部门可以调整并制定必要的政策,以改善BIM在项目交付中的实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Capability improvement measures of the public sector for implementation of building information modeling in construction projects
Abstract This study examines the capability improvement measures of the public sector client for enhancing the implementation of building information modeling (BIM) in construction project delivery. The study adopted a quantitative descriptive analysis based on primary data obtained through a structured questionnaire. A total of 198 valid questionnaires obtained from construction professionals within public sector organizations in Lagos State, Nigeria, provided primary quantitative data for the assessment. Data collected were analyzed using descriptive and inferential statistics. The findings indicated the measures to enhance the capacity of the public sector for BIM implementation including the following: team-based structure and recruitment of adequate number of staff (with mean score [MS] = 3.66), government support and involvement (MS = 3.64), government policies, adoption of process open to innovation, and investment in equipment and technology (MS = 3.60) had been considerably entrenched. However, measures that resulted in improved efficiency were limited to the following: reward system for performance (MS = 3.81), government policies, and education and training of staff (MS = 3.74), government support and involvement (MS = 3.73), and clear job description (MS = 3.71). Most of the measures with high level of impact were not necessarily those that are frequently used. On this basis, the public sector needs to differ from the status quo by adopting improvement measures that are appropriate for enhancing its capabilities for BIM in project delivery. The findings indicate implications that could enable the public sector to adjust and make necessary policies in a bid to improve BIM implementation in project delivery.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1