{"title":"信息和通信技术项目的成本管理","authors":"Zulkiflee Abdul-Samad, Patrick Pragasam Kulandaisamy","doi":"10.32738/jeppm-2022-0015","DOIUrl":null,"url":null,"abstract":"Information and communication technology (ICT) is an important sector that contributes to the development of a country. However, the success of this sector depends on the success of the ICT projects. Hence, ICT projects must be managed efficiently and effectively to ensure that they are successfully implemented. The literature review reveals that most of the ICT projects around the globe are in a challenged state, especially in terms of cost. This quantitative research aims to explore the cost influencing factors of the ICT projects in Malaysia and to build a cost influencing factors framework as a knowledge base for project managers. A 5-point Likert scale survey was conducted using the purposive sampling and the snowball sampling method to solicit responses from a large population of ICT project managers. The responses of 194 ICT project managers in Malaysia were analyzed, and the top 15 cost influencing factors were identified at different phases of a project. This result was used to build a cost influencing factors framework as a knowledge base for ICT project management.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost Management for Information and Communication Technology Projects\",\"authors\":\"Zulkiflee Abdul-Samad, Patrick Pragasam Kulandaisamy\",\"doi\":\"10.32738/jeppm-2022-0015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Information and communication technology (ICT) is an important sector that contributes to the development of a country. However, the success of this sector depends on the success of the ICT projects. Hence, ICT projects must be managed efficiently and effectively to ensure that they are successfully implemented. The literature review reveals that most of the ICT projects around the globe are in a challenged state, especially in terms of cost. This quantitative research aims to explore the cost influencing factors of the ICT projects in Malaysia and to build a cost influencing factors framework as a knowledge base for project managers. A 5-point Likert scale survey was conducted using the purposive sampling and the snowball sampling method to solicit responses from a large population of ICT project managers. The responses of 194 ICT project managers in Malaysia were analyzed, and the top 15 cost influencing factors were identified at different phases of a project. This result was used to build a cost influencing factors framework as a knowledge base for ICT project management.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32738/jeppm-2022-0015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

摘要

信息通信技术(ICT)是促进国家发展的重要产业。然而,该部门的成功取决于信息和通信技术项目的成功。因此,必须对信息和通信技术项目进行高效和有效的管理,以确保其成功实施。文献综述表明,全球大多数ICT项目都处于挑战状态,特别是在成本方面。本定量研究旨在探讨马来西亚ICT项目的成本影响因素,并建立成本影响因素框架,作为项目经理的知识库。采用有目的抽样和滚雪球抽样的方法进行5点李克特量表调查,以征求大量ICT项目经理的回应。对马来西亚194名ICT项目经理的回应进行了分析,并在项目的不同阶段确定了前15个成本影响因素。该研究结果用于构建成本影响因素框架,作为ICT项目管理的知识库。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Cost Management for Information and Communication Technology Projects
Information and communication technology (ICT) is an important sector that contributes to the development of a country. However, the success of this sector depends on the success of the ICT projects. Hence, ICT projects must be managed efficiently and effectively to ensure that they are successfully implemented. The literature review reveals that most of the ICT projects around the globe are in a challenged state, especially in terms of cost. This quantitative research aims to explore the cost influencing factors of the ICT projects in Malaysia and to build a cost influencing factors framework as a knowledge base for project managers. A 5-point Likert scale survey was conducted using the purposive sampling and the snowball sampling method to solicit responses from a large population of ICT project managers. The responses of 194 ICT project managers in Malaysia were analyzed, and the top 15 cost influencing factors were identified at different phases of a project. This result was used to build a cost influencing factors framework as a knowledge base for ICT project management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1