光纤基础设施的领导技能、利益相关者管理和执行

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-01-01 DOI:10.2478/jeppm-2020-0010
J. Akhwaba, O. Bowa, P. Keiyoro
{"title":"光纤基础设施的领导技能、利益相关者管理和执行","authors":"J. Akhwaba, O. Bowa, P. Keiyoro","doi":"10.2478/jeppm-2020-0010","DOIUrl":null,"url":null,"abstract":"Abstract The main purpose of this study was to investigate how leadership skills and stakeholder management acting together to influence the execution of fibre optic infrastructure. The study adopted the pragmatism research paradigm, with a cross-sectional survey design. Census was used to select 187 respondents from a target population of 187 functional members of staff in fibre optic infrastructure departments of two mobile telecommunication and four internet service companies in Nairobi County, Kenya. A self-administered structured questionnaire was used to collect quantitative data while an interview guide and document review guide were used to collect qualitative data. Inferential statistical analysis was performed using multiple regression. It was demonstrated that leadership skills and stakeholder management act together to have a significant positive influence on the execution of fibre optic infrastructure. Therefore, there is a need for companies to ensure that stakeholders are involved in all phases of a project from inception to closure. Mobile telecommunication and internet service providing companies should also develop training programs to improve the leadership skills of project leaders and make use of conflict management strategies and communication skills to ensure appropriate management of change. It was suggested that similar and comparable studies should be conducted in other countries across the world.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Leadership Skills, Stakeholder Management and Execution of Fibre Optic Infrastructure\",\"authors\":\"J. Akhwaba, O. Bowa, P. Keiyoro\",\"doi\":\"10.2478/jeppm-2020-0010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The main purpose of this study was to investigate how leadership skills and stakeholder management acting together to influence the execution of fibre optic infrastructure. The study adopted the pragmatism research paradigm, with a cross-sectional survey design. Census was used to select 187 respondents from a target population of 187 functional members of staff in fibre optic infrastructure departments of two mobile telecommunication and four internet service companies in Nairobi County, Kenya. A self-administered structured questionnaire was used to collect quantitative data while an interview guide and document review guide were used to collect qualitative data. Inferential statistical analysis was performed using multiple regression. It was demonstrated that leadership skills and stakeholder management act together to have a significant positive influence on the execution of fibre optic infrastructure. Therefore, there is a need for companies to ensure that stakeholders are involved in all phases of a project from inception to closure. Mobile telecommunication and internet service providing companies should also develop training programs to improve the leadership skills of project leaders and make use of conflict management strategies and communication skills to ensure appropriate management of change. It was suggested that similar and comparable studies should be conducted in other countries across the world.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 3

摘要

本研究的主要目的是调查领导技能和利益相关者管理如何共同影响光纤基础设施的执行。本研究采用实用主义研究范式,采用横断面调查设计。人口普查用于从肯尼亚内罗毕县两家移动电信和四家互联网服务公司光纤基础设施部门的187名工作人员的目标人口中选择187名受访者。采用自填式结构化问卷收集定量数据,采用访谈指南和文献回顾指南收集定性数据。采用多元回归进行推理统计分析。研究表明,领导技能和利益相关者管理共同行动,对光纤基础设施的执行产生重大的积极影响。因此,公司有必要确保利益相关者参与到项目从开始到结束的所有阶段。提供移动通信和互联网服务的公司还应该制定培训计划,以提高项目负责人的领导技能,并利用冲突管理策略和沟通技巧,以确保适当的变更管理。有人建议,应在世界其他国家进行类似和可比的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Leadership Skills, Stakeholder Management and Execution of Fibre Optic Infrastructure
Abstract The main purpose of this study was to investigate how leadership skills and stakeholder management acting together to influence the execution of fibre optic infrastructure. The study adopted the pragmatism research paradigm, with a cross-sectional survey design. Census was used to select 187 respondents from a target population of 187 functional members of staff in fibre optic infrastructure departments of two mobile telecommunication and four internet service companies in Nairobi County, Kenya. A self-administered structured questionnaire was used to collect quantitative data while an interview guide and document review guide were used to collect qualitative data. Inferential statistical analysis was performed using multiple regression. It was demonstrated that leadership skills and stakeholder management act together to have a significant positive influence on the execution of fibre optic infrastructure. Therefore, there is a need for companies to ensure that stakeholders are involved in all phases of a project from inception to closure. Mobile telecommunication and internet service providing companies should also develop training programs to improve the leadership skills of project leaders and make use of conflict management strategies and communication skills to ensure appropriate management of change. It was suggested that similar and comparable studies should be conducted in other countries across the world.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1