{"title":"技术演进下的非等额资产置换:多周期方法","authors":"Y. Yatsenko, N. Hritonenko, S. Boranbayev","doi":"10.1080/0013791x.2020.1716126","DOIUrl":null,"url":null,"abstract":"Abstract This paper studies the cost-minimizing serial asset replacement problem under changing operating and replacement costs. Technological improvements affect these costs in different ways, which leads to different duration of sequential replacement cycles of the same asset. Therefore, a firm should optimize a chain of consecutive asset replacements using available information about future costs. We offer a novel multi-cycle algorithm for making such replacement decisions and prove that it converges to the infinite-horizon solution when the number of cycles increases. Important qualitative properties of the obtained optimal non-equal-life replacement strategies are derived, and practical recommendations are discussed.","PeriodicalId":49210,"journal":{"name":"Engineering Economist","volume":"65 1","pages":"339 - 362"},"PeriodicalIF":1.0000,"publicationDate":"2020-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0013791x.2020.1716126","citationCount":"9","resultStr":"{\"title\":\"Non-equal-life asset replacement under evolving technology: A multi-cycle approach\",\"authors\":\"Y. Yatsenko, N. Hritonenko, S. Boranbayev\",\"doi\":\"10.1080/0013791x.2020.1716126\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract This paper studies the cost-minimizing serial asset replacement problem under changing operating and replacement costs. Technological improvements affect these costs in different ways, which leads to different duration of sequential replacement cycles of the same asset. Therefore, a firm should optimize a chain of consecutive asset replacements using available information about future costs. We offer a novel multi-cycle algorithm for making such replacement decisions and prove that it converges to the infinite-horizon solution when the number of cycles increases. Important qualitative properties of the obtained optimal non-equal-life replacement strategies are derived, and practical recommendations are discussed.\",\"PeriodicalId\":49210,\"journal\":{\"name\":\"Engineering Economist\",\"volume\":\"65 1\",\"pages\":\"339 - 362\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2020-01-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0013791x.2020.1716126\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Economist\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1080/0013791x.2020.1716126\",\"RegionNum\":4,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Economist","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1080/0013791x.2020.1716126","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
Non-equal-life asset replacement under evolving technology: A multi-cycle approach
Abstract This paper studies the cost-minimizing serial asset replacement problem under changing operating and replacement costs. Technological improvements affect these costs in different ways, which leads to different duration of sequential replacement cycles of the same asset. Therefore, a firm should optimize a chain of consecutive asset replacements using available information about future costs. We offer a novel multi-cycle algorithm for making such replacement decisions and prove that it converges to the infinite-horizon solution when the number of cycles increases. Important qualitative properties of the obtained optimal non-equal-life replacement strategies are derived, and practical recommendations are discussed.
Engineering EconomistENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
2.00
自引率
0.00%
发文量
14
审稿时长
>12 weeks
期刊介绍:
The Engineering Economist is a refereed journal published jointly by the Engineering Economy Division of the American Society of Engineering Education (ASEE) and the Institute of Industrial and Systems Engineers (IISE). The journal publishes articles, case studies, surveys, and book and software reviews that represent original research, current practice, and teaching involving problems of capital investment.
The journal seeks submissions in a number of areas, including, but not limited to: capital investment analysis, financial risk management, cost estimation and accounting, cost of capital, design economics, economic decision analysis, engineering economy education, research and development, and the analysis of public policy when it is relevant to the economic investment decisions made by engineers and technology managers.