{"title":"公共建筑绿色屋顶和墙壁的社会经济可行性:葡萄牙小学的案例研究","authors":"C. Almeida, Inês Teotónio, C. Silva, C. Cruz","doi":"10.1080/0013791X.2020.1748255","DOIUrl":null,"url":null,"abstract":"Abstract Green infrastructure has been applied in urban areas to mitigate the negative effects of urbanization and promote the efficient use of resources. This study suggests a methodology for assessing the economic value of installing green roofs and green walls in public buildings, particularly in primary schools. The economic evaluation considers costs and benefits from three perspectives—(i) infrastructure, (ii) users, and (iii) environment—using three levels of analysis (i) financial, (ii) economic, and (iii) socio-environmental. The methodology is applied to ten alternative green roofs/walls scenarios in two primary schools in Lisbon, Portugal, for validation purposes. The cost-benefit analysis is carried out for a 40 and 50-year life cycle, using a 6.67% discount rate. The results show that all scenarios are feasible. The final benefit-cost ratios range between 3.01 and 34.99. A sensitivity analysis shows that the installation cost, esthetic improvement, and increased sound insulation have a significant impact on the results.","PeriodicalId":49210,"journal":{"name":"Engineering Economist","volume":"66 1","pages":"27 - 50"},"PeriodicalIF":1.0000,"publicationDate":"2021-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0013791X.2020.1748255","citationCount":"11","resultStr":"{\"title\":\"Socioeconomic feasibility of green roofs and walls in public buildings: The case study of primary schools in Portugal\",\"authors\":\"C. Almeida, Inês Teotónio, C. Silva, C. Cruz\",\"doi\":\"10.1080/0013791X.2020.1748255\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Green infrastructure has been applied in urban areas to mitigate the negative effects of urbanization and promote the efficient use of resources. This study suggests a methodology for assessing the economic value of installing green roofs and green walls in public buildings, particularly in primary schools. The economic evaluation considers costs and benefits from three perspectives—(i) infrastructure, (ii) users, and (iii) environment—using three levels of analysis (i) financial, (ii) economic, and (iii) socio-environmental. The methodology is applied to ten alternative green roofs/walls scenarios in two primary schools in Lisbon, Portugal, for validation purposes. The cost-benefit analysis is carried out for a 40 and 50-year life cycle, using a 6.67% discount rate. The results show that all scenarios are feasible. The final benefit-cost ratios range between 3.01 and 34.99. A sensitivity analysis shows that the installation cost, esthetic improvement, and increased sound insulation have a significant impact on the results.\",\"PeriodicalId\":49210,\"journal\":{\"name\":\"Engineering Economist\",\"volume\":\"66 1\",\"pages\":\"27 - 50\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2021-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0013791X.2020.1748255\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Economist\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1080/0013791X.2020.1748255\",\"RegionNum\":4,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Economist","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1080/0013791X.2020.1748255","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
Socioeconomic feasibility of green roofs and walls in public buildings: The case study of primary schools in Portugal
Abstract Green infrastructure has been applied in urban areas to mitigate the negative effects of urbanization and promote the efficient use of resources. This study suggests a methodology for assessing the economic value of installing green roofs and green walls in public buildings, particularly in primary schools. The economic evaluation considers costs and benefits from three perspectives—(i) infrastructure, (ii) users, and (iii) environment—using three levels of analysis (i) financial, (ii) economic, and (iii) socio-environmental. The methodology is applied to ten alternative green roofs/walls scenarios in two primary schools in Lisbon, Portugal, for validation purposes. The cost-benefit analysis is carried out for a 40 and 50-year life cycle, using a 6.67% discount rate. The results show that all scenarios are feasible. The final benefit-cost ratios range between 3.01 and 34.99. A sensitivity analysis shows that the installation cost, esthetic improvement, and increased sound insulation have a significant impact on the results.
Engineering EconomistENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
2.00
自引率
0.00%
发文量
14
审稿时长
>12 weeks
期刊介绍:
The Engineering Economist is a refereed journal published jointly by the Engineering Economy Division of the American Society of Engineering Education (ASEE) and the Institute of Industrial and Systems Engineers (IISE). The journal publishes articles, case studies, surveys, and book and software reviews that represent original research, current practice, and teaching involving problems of capital investment.
The journal seeks submissions in a number of areas, including, but not limited to: capital investment analysis, financial risk management, cost estimation and accounting, cost of capital, design economics, economic decision analysis, engineering economy education, research and development, and the analysis of public policy when it is relevant to the economic investment decisions made by engineers and technology managers.