操作员层面的持续改进

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-01-01 DOI:10.2478/jeppm-2020-0008
J. Lerche, H. Neve, S. Wandahl, A. Gross
{"title":"操作员层面的持续改进","authors":"J. Lerche, H. Neve, S. Wandahl, A. Gross","doi":"10.2478/jeppm-2020-0008","DOIUrl":null,"url":null,"abstract":"Abstract Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified for a visual board implementation, covering two alternative processes with a fixed number of technicians per performing team. The knowledge base for the conceptual model is based on Takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the development and evaluation of the conceptual model combining takt planning and the Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"64 - 70"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Continuous Improvements at Operator Level\",\"authors\":\"J. Lerche, H. Neve, S. Wandahl, A. Gross\",\"doi\":\"10.2478/jeppm-2020-0008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified for a visual board implementation, covering two alternative processes with a fixed number of technicians per performing team. The knowledge base for the conceptual model is based on Takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the development and evaluation of the conceptual model combining takt planning and the Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"10 1\",\"pages\":\"64 - 70\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 12

摘要

摘要以前很少有实证研究报道takt规划的实施和利用Deming循环(PDCA)来连续控制施工工作流程。本文介绍了一个与建筑业密切相关的海上可再生能源行业的案例研究。本文旨在开发和评估海上风电施工环境中结合takt规划和Deming循环的概念模型。通过与施工专家的互动,概念模型已被修改为视觉板实施,涵盖了两个备选流程,每个执行团队有固定数量的技术人员。概念模型的知识库基于精益施工社区的Takt规划实施和精益生产社区的PDCA实施。本文的主要贡献是在建筑环境中开发和评估结合takt规划和Deming循环的概念模型。这一概念模型对建筑和翻新行业具有潜在的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Continuous Improvements at Operator Level
Abstract Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified for a visual board implementation, covering two alternative processes with a fixed number of technicians per performing team. The knowledge base for the conceptual model is based on Takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the development and evaluation of the conceptual model combining takt planning and the Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1