{"title":"长通道施工中冻结管偏差对冻结壁发展的影响","authors":"JunHao Chen ,&nbsp;JianLin Wang ,&nbsp;LeXiao Wang ,&nbsp;Han Li ,&nbsp;MeiLin Chen","doi":"10.1016/j.rcar.2022.08.006","DOIUrl":null,"url":null,"abstract":"<div><p>This paper investigates the influence of the deviation in freeze pipe installation on the development of the frozen wall in long cross passages by numerical simulation with ANSYS software. The study case is from the artificial ground freezing project along the Fuzhou Metro Line 2 between Ziyang Station and Wuliting Station. Two freeze-pipe configurations, <em>i.e.</em>, one with perfectly aligned pipes without any deviation from design and another with randomly distributed deviation, are included for comparison. The effect of the random deviation in the freeze pipes on frozen wall interconnection time, the thickness of the frozen wall and the development of the temperature field is explored. For the characteristic section of the numerical model at a depth of 25 m, it is found that the frozen wall interconnection time under the random deviation case and no deviation case is 24 days and 18 days, respectively. The difference in the thickness of the thinnest frozen wall segment between the random deviation and no deviation cases is the largest in the early freezing stage (up to 0.75 m), which decreases with time to 0.31 m in the late freezing stage. The effects of random deviation are more significant in the early freezing stage and diminish as the freezing time increases.</p></div>","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2097158322000064/pdfft?md5=7da361d0412fa0169f610750473e76f1&pid=1-s2.0-S2097158322000064-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Influence of freeze tube deviation on the development of frozen wall during long cross-passage construction\",\"authors\":\"JunHao Chen ,&nbsp;JianLin Wang ,&nbsp;LeXiao Wang ,&nbsp;Han Li ,&nbsp;MeiLin Chen\",\"doi\":\"10.1016/j.rcar.2022.08.006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper investigates the influence of the deviation in freeze pipe installation on the development of the frozen wall in long cross passages by numerical simulation with ANSYS software. The study case is from the artificial ground freezing project along the Fuzhou Metro Line 2 between Ziyang Station and Wuliting Station. Two freeze-pipe configurations, <em>i.e.</em>, one with perfectly aligned pipes without any deviation from design and another with randomly distributed deviation, are included for comparison. The effect of the random deviation in the freeze pipes on frozen wall interconnection time, the thickness of the frozen wall and the development of the temperature field is explored. For the characteristic section of the numerical model at a depth of 25 m, it is found that the frozen wall interconnection time under the random deviation case and no deviation case is 24 days and 18 days, respectively. The difference in the thickness of the thinnest frozen wall segment between the random deviation and no deviation cases is the largest in the early freezing stage (up to 0.75 m), which decreases with time to 0.31 m in the late freezing stage. The effects of random deviation are more significant in the early freezing stage and diminish as the freezing time increases.</p></div>\",\"PeriodicalId\":0,\"journal\":{\"name\":\"\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0,\"publicationDate\":\"2022-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2097158322000064/pdfft?md5=7da361d0412fa0169f610750473e76f1&pid=1-s2.0-S2097158322000064-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2097158322000064\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2097158322000064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文利用ANSYS软件对长交叉通道冻结管安装偏差对冻结壁发展的影响进行了数值模拟研究。将两种冻结管配置进行比较,一种是完全对中且不偏离设计的管道,另一种是随机分布偏离的管道。探讨了冻结管内随机偏差对冻结壁连接时间、冻结壁厚度和温度场发展的影响。对于深度为25 m的数值模型特征断面,发现随机偏差情况和无偏差情况下冻结壁互联时间分别为24天和18天。随机偏差与无偏差情况下最薄冻结壁段厚度的差异在冻结初期最大(可达0.75 m),随着时间的推移,冻结后期最薄冻结壁段厚度的差异减小至0.31 m。随机偏差的影响在冻结初期更为显著,随冻结时间的增加而减弱。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
Influence of freeze tube deviation on the development of frozen wall during long cross-passage construction

This paper investigates the influence of the deviation in freeze pipe installation on the development of the frozen wall in long cross passages by numerical simulation with ANSYS software. The study case is from the artificial ground freezing project along the Fuzhou Metro Line 2 between Ziyang Station and Wuliting Station. Two freeze-pipe configurations, i.e., one with perfectly aligned pipes without any deviation from design and another with randomly distributed deviation, are included for comparison. The effect of the random deviation in the freeze pipes on frozen wall interconnection time, the thickness of the frozen wall and the development of the temperature field is explored. For the characteristic section of the numerical model at a depth of 25 m, it is found that the frozen wall interconnection time under the random deviation case and no deviation case is 24 days and 18 days, respectively. The difference in the thickness of the thinnest frozen wall segment between the random deviation and no deviation cases is the largest in the early freezing stage (up to 0.75 m), which decreases with time to 0.31 m in the late freezing stage. The effects of random deviation are more significant in the early freezing stage and diminish as the freezing time increases.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1