{"title":"视界不确定性下的并行机置换","authors":"Javad Seif, B. Shields, A. J. Yu","doi":"10.1080/0013791X.2018.1535012","DOIUrl":null,"url":null,"abstract":"Abstract Construction projects usually get delayed for several time periods. When the planning horizon of a project is extended, projections for purchase and salvage of machinery within the planning horizon become inaccurate and less beneficial and often lead to unexpected costs. In this article, we formulate a parallel machine replacement (PMR) problem as a two-stage stochastic program with an uncertain planning horizon. We consider renting as an alternative to purchasing and maintaining the machinery. We show the application of the model through a case study in construction projects. Through numerical analysis, we derive managerial implications and show the value of the stochastic model.","PeriodicalId":49210,"journal":{"name":"Engineering Economist","volume":"64 1","pages":"1 - 23"},"PeriodicalIF":1.0000,"publicationDate":"2018-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0013791X.2018.1535012","citationCount":"6","resultStr":"{\"title\":\"Parallel machine replacement under horizon uncertainty\",\"authors\":\"Javad Seif, B. Shields, A. J. Yu\",\"doi\":\"10.1080/0013791X.2018.1535012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Construction projects usually get delayed for several time periods. When the planning horizon of a project is extended, projections for purchase and salvage of machinery within the planning horizon become inaccurate and less beneficial and often lead to unexpected costs. In this article, we formulate a parallel machine replacement (PMR) problem as a two-stage stochastic program with an uncertain planning horizon. We consider renting as an alternative to purchasing and maintaining the machinery. We show the application of the model through a case study in construction projects. Through numerical analysis, we derive managerial implications and show the value of the stochastic model.\",\"PeriodicalId\":49210,\"journal\":{\"name\":\"Engineering Economist\",\"volume\":\"64 1\",\"pages\":\"1 - 23\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2018-12-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0013791X.2018.1535012\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Economist\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1080/0013791X.2018.1535012\",\"RegionNum\":4,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Economist","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1080/0013791X.2018.1535012","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
Parallel machine replacement under horizon uncertainty
Abstract Construction projects usually get delayed for several time periods. When the planning horizon of a project is extended, projections for purchase and salvage of machinery within the planning horizon become inaccurate and less beneficial and often lead to unexpected costs. In this article, we formulate a parallel machine replacement (PMR) problem as a two-stage stochastic program with an uncertain planning horizon. We consider renting as an alternative to purchasing and maintaining the machinery. We show the application of the model through a case study in construction projects. Through numerical analysis, we derive managerial implications and show the value of the stochastic model.
Engineering EconomistENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
2.00
自引率
0.00%
发文量
14
审稿时长
>12 weeks
期刊介绍:
The Engineering Economist is a refereed journal published jointly by the Engineering Economy Division of the American Society of Engineering Education (ASEE) and the Institute of Industrial and Systems Engineers (IISE). The journal publishes articles, case studies, surveys, and book and software reviews that represent original research, current practice, and teaching involving problems of capital investment.
The journal seeks submissions in a number of areas, including, but not limited to: capital investment analysis, financial risk management, cost estimation and accounting, cost of capital, design economics, economic decision analysis, engineering economy education, research and development, and the analysis of public policy when it is relevant to the economic investment decisions made by engineers and technology managers.