为煤矿超前工作面再生产过程控制的综合作业模型提供了方法学基础

Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva
{"title":"为煤矿超前工作面再生产过程控制的综合作业模型提供了方法学基础","authors":"Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva","doi":"10.21177/1998-4502-2022-14-4-685-694","DOIUrl":null,"url":null,"abstract":"This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.","PeriodicalId":37608,"journal":{"name":"Sustainable Development of Mountain Territories","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Methodological bases for synthesis operation models for control of the reproduction process of the advancing faces of coal mines\",\"authors\":\"Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva\",\"doi\":\"10.21177/1998-4502-2022-14-4-685-694\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.\",\"PeriodicalId\":37608,\"journal\":{\"name\":\"Sustainable Development of Mountain Territories\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable Development of Mountain Territories\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21177/1998-4502-2022-14-4-685-694\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Development of Mountain Territories","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21177/1998-4502-2022-14-4-685-694","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了对煤矿长壁区时间预测开发储量和工作面长壁线准备时间的可靠性和可靠性进行优化的结果。提出了一种以决策树模型的形式再现长壁前沿过程的方案。建立了无采煤损失的最佳概率和最佳动态时间储备与长壁和准备工作的可靠性、短缺情况下的损坏率以及维护清洁前沿的成本的关系。结果表明,在制定矿山开发计划时,应确定每个处理面的最佳动态时间储备值。可以确定,当提供长壁前缘重现过程的动态冗余时,更充分地实现了对准备开采的矿产储量进行脱气和排水的可能性,这对长壁作业的可靠性和安全性水平产生了积极影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Methodological bases for synthesis operation models for control of the reproduction process of the advancing faces of coal mines
This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Sustainable Development of Mountain Territories
Sustainable Development of Mountain Territories Social Sciences-Sociology and Political Science
CiteScore
2.40
自引率
0.00%
发文量
36
期刊介绍: International scientific journal "Sustainable development of mountain territories" covers fundamental and applied regional, national and international research and provides a platform to publish original full papers and related reviews in the following areas: engineering science and Earth science in the field of sustainable development of mountain territories. Main objectives of international scientific journal "Sustainable development of mountain territories" are: raising the level of professional scientific workers, teachers of higher educational institutions and scientific organizations; presentation of research results in the field of sustainable development of mountain areas on the technical aspects and Earth sciences, informing readers about the results of Russian and international scientific forums; improved review and editing of the articles submitted for publication; ensuring wide dissemination for the published articles in the international academic environment; encouraging dissemination and indexing of scientific works in various foreign key citation databases.
期刊最新文献
Socio-economic initiative in the sustainable development of Ural Cities Determination of parameters of elastic damping devices in mining shovel mechanisms Modeling and control of parameters of flow technologies with local hydraulic transport and coal dewatering based on analysis of the structure of the tunneling cycle Analysis of the nanoparticles formation mechanisms in the rock mass Assessment of the current state of the hydrochemical regime and water-environmental problems of the basin of the Gavaraget River flowing into Lake Sevan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1