{"title":"Karun 1大坝底孔检修闸门及事故闸门修复方案研究","authors":"Mohsen Ghaderi","doi":"10.1680/JDARE.20.00016","DOIUrl":null,"url":null,"abstract":"Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering tha...","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":"30 1","pages":"91-96"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/JDARE.20.00016","citationCount":"2","resultStr":"{\"title\":\"Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam\",\"authors\":\"Mohsen Ghaderi\",\"doi\":\"10.1680/JDARE.20.00016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering tha...\",\"PeriodicalId\":39070,\"journal\":{\"name\":\"Dams and Reservoirs\",\"volume\":\"30 1\",\"pages\":\"91-96\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1680/JDARE.20.00016\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dams and Reservoirs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JDARE.20.00016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JDARE.20.00016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
Study of rehabilitation plan of bottom outlet service and emergency gates of Karun 1 dam
Rehabilitation and renovation of damaged tunnels and hydro-mechanical equipment of dam and power plant projects in Iran is a major challenge and has to be seriously planned for now. Considering tha...