{"title":"越南Nui Beo煤矿开采长壁时用数值模拟方法确定岩体位移带","authors":"Tien Trung Vu, Son Anh Do","doi":"10.33271/mining17.01.059","DOIUrl":null,"url":null,"abstract":"Purpose. It is important to conduct a study to identify the displacement zone caused by mining operations. By numerical modeling the process of mining the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, Vietnam, the authors have deter-mined the total height of the rock mass displacement zone and the boundary of the affected area on the topographic surface. Methods. In this study, the authors use a numerical modeling method. The models are developed based on the UDEC (Universal Distinct Element Code) software. In addition, field survey methods and statistical analysis methods are used. Findings. Based on the analysis of the numerical modeling results, it has been determined that the total height of the displacement zone, when exploiting the longwall 31104 in Seam 11, is about 63 m. The analysis of the numerical modeling results also shows that the roof collapse angle is 52°, which determines the area of influence on the topographic surface in the range of 160 m. Originality. Based on the UDEC software, the authors have developed a simulation model for the mining process of the longwall 31104 in Seam 11. Analysis of the model results has shown the state of the displacement zone of the surrounding rock mass. In this study, the numerical modeling method is applied to simulate the longwall displacement zone, which is consistent with the actual production of the underground mine. Practical implications. Based on the analysis of the surrounding rock mass displacements zone, when exploiting the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, the affected boundary on the topographic surface has been determined. At the same time, the height of the rock mass displacement zone has also been calculated. Thus, the research results can be used as a basis for implementation in actual production at the Nui Beo Coal Mine.","PeriodicalId":43896,"journal":{"name":"Mining of Mineral Deposits","volume":" ","pages":""},"PeriodicalIF":2.8000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Determination of the rock mass displacement zone by numerical modeling method when exploiting the longwall at the Nui Beo Coal Mine, Vietnam\",\"authors\":\"Tien Trung Vu, Son Anh Do\",\"doi\":\"10.33271/mining17.01.059\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose. It is important to conduct a study to identify the displacement zone caused by mining operations. By numerical modeling the process of mining the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, Vietnam, the authors have deter-mined the total height of the rock mass displacement zone and the boundary of the affected area on the topographic surface. Methods. In this study, the authors use a numerical modeling method. The models are developed based on the UDEC (Universal Distinct Element Code) software. In addition, field survey methods and statistical analysis methods are used. Findings. Based on the analysis of the numerical modeling results, it has been determined that the total height of the displacement zone, when exploiting the longwall 31104 in Seam 11, is about 63 m. The analysis of the numerical modeling results also shows that the roof collapse angle is 52°, which determines the area of influence on the topographic surface in the range of 160 m. Originality. Based on the UDEC software, the authors have developed a simulation model for the mining process of the longwall 31104 in Seam 11. Analysis of the model results has shown the state of the displacement zone of the surrounding rock mass. In this study, the numerical modeling method is applied to simulate the longwall displacement zone, which is consistent with the actual production of the underground mine. Practical implications. Based on the analysis of the surrounding rock mass displacements zone, when exploiting the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, the affected boundary on the topographic surface has been determined. At the same time, the height of the rock mass displacement zone has also been calculated. Thus, the research results can be used as a basis for implementation in actual production at the Nui Beo Coal Mine.\",\"PeriodicalId\":43896,\"journal\":{\"name\":\"Mining of Mineral Deposits\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.8000,\"publicationDate\":\"2023-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining of Mineral Deposits\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33271/mining17.01.059\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining of Mineral Deposits","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/mining17.01.059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 4

摘要

意图进行研究以确定采矿作业引起的位移带是很重要的。通过对越南Nui Beo煤矿11煤层31104长壁开采过程的数值模拟,作者确定了岩体位移带的总高度和地形表面上受影响区域的边界。方法。在这项研究中,作者使用了一种数值建模方法。这些模型是基于UDEC(通用区别元素代码)软件开发的。此外,还采用了实地调查方法和统计分析方法。调查结果。根据数值模拟结果的分析,确定开采11煤层31104长壁时,位移带的总高度约为63m。数值模拟结果分析还表明,顶板坍塌角为52°,这决定了对地形表面的影响区域在160m范围内。独创性。基于UDEC软件,作者开发了11煤层31104长壁开采过程的模拟模型。对模型结果的分析显示了围岩位移带的状态。本研究采用数值建模方法模拟了长壁位移带,与地下矿山的实际生产相一致。实际意义。通过对围岩位移带的分析,确定了Nui Beo煤矿11煤层31104长壁开采时,受影响的地形面边界。同时,还计算了岩体位移带的高度。因此,研究结果可作为在Nui Beo煤矿实际生产中实施的依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Determination of the rock mass displacement zone by numerical modeling method when exploiting the longwall at the Nui Beo Coal Mine, Vietnam
Purpose. It is important to conduct a study to identify the displacement zone caused by mining operations. By numerical modeling the process of mining the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, Vietnam, the authors have deter-mined the total height of the rock mass displacement zone and the boundary of the affected area on the topographic surface. Methods. In this study, the authors use a numerical modeling method. The models are developed based on the UDEC (Universal Distinct Element Code) software. In addition, field survey methods and statistical analysis methods are used. Findings. Based on the analysis of the numerical modeling results, it has been determined that the total height of the displacement zone, when exploiting the longwall 31104 in Seam 11, is about 63 m. The analysis of the numerical modeling results also shows that the roof collapse angle is 52°, which determines the area of influence on the topographic surface in the range of 160 m. Originality. Based on the UDEC software, the authors have developed a simulation model for the mining process of the longwall 31104 in Seam 11. Analysis of the model results has shown the state of the displacement zone of the surrounding rock mass. In this study, the numerical modeling method is applied to simulate the longwall displacement zone, which is consistent with the actual production of the underground mine. Practical implications. Based on the analysis of the surrounding rock mass displacements zone, when exploiting the longwall 31104 in Seam 11 at the Nui Beo Coal Mine, the affected boundary on the topographic surface has been determined. At the same time, the height of the rock mass displacement zone has also been calculated. Thus, the research results can be used as a basis for implementation in actual production at the Nui Beo Coal Mine.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Mining of Mineral Deposits
Mining of Mineral Deposits MINING & MINERAL PROCESSING-
CiteScore
5.20
自引率
15.80%
发文量
52
期刊最新文献
Analyzing stability of protective structures as the elements of geotechnical tailing pond safety Mining of non-metallic mineral deposits in the context of Ukraine’s reconstruction in the war and post-war periods Optimizing the blast fragmentation quality of discontinuous rock mass: Case study of Jebel Bouzegza Open-Cast Mine, North Algeria Use of solid mining waste to improve water retention capacity of loamy soils Deformation as a process to transform shape and volume of protective structures of the development mine workings during coal-rock mass off-loading
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1