{"title":"露天矿复垦工作量估算程序","authors":"S. V. Chmykhalova","doi":"10.17580/em.2023.01.18","DOIUrl":null,"url":null,"abstract":"only on evaluation of overburden rock volume with regard to their disintegration and swelling which increase the rock volume.","PeriodicalId":52085,"journal":{"name":"Eurasian Mining","volume":" ","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Toward a reclamation effort estimation procedure for open pit mines\",\"authors\":\"S. V. Chmykhalova\",\"doi\":\"10.17580/em.2023.01.18\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"only on evaluation of overburden rock volume with regard to their disintegration and swelling which increase the rock volume.\",\"PeriodicalId\":52085,\"journal\":{\"name\":\"Eurasian Mining\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eurasian Mining\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17580/em.2023.01.18\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eurasian Mining","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17580/em.2023.01.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}