Sissinghurst城堡塔保护:在冬季短时间内取得成果

Pub Date : 2019-02-27 DOI:10.1080/13556207.2019.1577634
Charles Bain Smith
{"title":"Sissinghurst城堡塔保护:在冬季短时间内取得成果","authors":"Charles Bain Smith","doi":"10.1080/13556207.2019.1577634","DOIUrl":null,"url":null,"abstract":"ABSTRACT The Sissinghurst Tower Conservation Project was complex project in terms of project management because it required the coordination of a number of work-streams and disciplines within a very short time opportunity during winter, a season that is usually adverse to building conservation work. The project involved interpretation and exhibitions, moving of historic collections, horticulture and building conservation work. A number of elements of the building required specialist conservation work and investigations. The project required a great deal of critical path analysis and proactive communication. It comprised a comprehensive conservation programme to undertake priority works such as the condition of the stone parapets, weathervanes, timber staircase and brick window mullions. However with the considerable cost of scaffolding other less urgent works were brought forward. A far better archaeological understanding was long overdue and this was also undertaken. The results were of excellent quality, delivered on time and slightly below budget. The project opened up the need to look further at conservation of Vita’s Writing Room, a room on the first floor which houses an important collection. This will need to be a sensitively planned future project balancing the needs of building and collections conservation.","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2019-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/13556207.2019.1577634","citationCount":"0","resultStr":"{\"title\":\"Sissinghurst Castle Tower conservation: achieving results in winter in a narrow timeframe\",\"authors\":\"Charles Bain Smith\",\"doi\":\"10.1080/13556207.2019.1577634\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The Sissinghurst Tower Conservation Project was complex project in terms of project management because it required the coordination of a number of work-streams and disciplines within a very short time opportunity during winter, a season that is usually adverse to building conservation work. The project involved interpretation and exhibitions, moving of historic collections, horticulture and building conservation work. A number of elements of the building required specialist conservation work and investigations. The project required a great deal of critical path analysis and proactive communication. It comprised a comprehensive conservation programme to undertake priority works such as the condition of the stone parapets, weathervanes, timber staircase and brick window mullions. However with the considerable cost of scaffolding other less urgent works were brought forward. A far better archaeological understanding was long overdue and this was also undertaken. The results were of excellent quality, delivered on time and slightly below budget. The project opened up the need to look further at conservation of Vita’s Writing Room, a room on the first floor which houses an important collection. This will need to be a sensitively planned future project balancing the needs of building and collections conservation.\",\"PeriodicalId\":0,\"journal\":{\"name\":\"\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0,\"publicationDate\":\"2019-02-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/13556207.2019.1577634\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/13556207.2019.1577634\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/13556207.2019.1577634","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

西辛赫斯特塔保护项目在项目管理方面是一个复杂的项目,因为它需要在冬季非常短的时间内协调多个工作流和学科,而冬季通常不利于建筑保护工作。该项目涉及解说和展览、历史藏品的移动、园艺和建筑保护工作。该建筑的许多部分需要专业的保护工作和调查。该项目需要大量的关键路径分析和主动沟通。它包括一项全面的保育计划,以进行优先工程,例如石护墙、风向标、木楼梯和砖窗竖框的状况。然而,由于脚手架的成本相当可观,其他不太紧急的工程也被提了出来。早该有更好的考古认识了,这也开始了。结果质量优异,按时交付,略低于预算。该项目开启了进一步保护Vita写作室的需要,这是一个位于一楼的房间,里面有一个重要的收藏品。这将是一个敏感的规划未来的项目,平衡建筑和收藏保护的需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
Sissinghurst Castle Tower conservation: achieving results in winter in a narrow timeframe
ABSTRACT The Sissinghurst Tower Conservation Project was complex project in terms of project management because it required the coordination of a number of work-streams and disciplines within a very short time opportunity during winter, a season that is usually adverse to building conservation work. The project involved interpretation and exhibitions, moving of historic collections, horticulture and building conservation work. A number of elements of the building required specialist conservation work and investigations. The project required a great deal of critical path analysis and proactive communication. It comprised a comprehensive conservation programme to undertake priority works such as the condition of the stone parapets, weathervanes, timber staircase and brick window mullions. However with the considerable cost of scaffolding other less urgent works were brought forward. A far better archaeological understanding was long overdue and this was also undertaken. The results were of excellent quality, delivered on time and slightly below budget. The project opened up the need to look further at conservation of Vita’s Writing Room, a room on the first floor which houses an important collection. This will need to be a sensitively planned future project balancing the needs of building and collections conservation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1