使用坎贝尔·杜达克·史密斯(CAMPBELL DUDEK SMITH)和DANNENBRING方法进行的生产调度分析,将大米的生产时间降到最低

Ni Kadek Budi Antari, L. Harini, Ni Ketut Tari Tastrawati
{"title":"使用坎贝尔·杜达克·史密斯(CAMPBELL DUDEK SMITH)和DANNENBRING方法进行的生产调度分析,将大米的生产时间降到最低","authors":"Ni Kadek Budi Antari, L. Harini, Ni Ketut Tari Tastrawati","doi":"10.24843/mtk.2021.v10.i04.p345","DOIUrl":null,"url":null,"abstract":"The increasing needs for basic materials has resulted in an increased production process of basic materials in a company. CV. Puspa is a manufacturing company engaged in the production of rice, on the production process, CV. Puspa often has a buildup of work so that it requires an alternative production scheduling optimally. This research was conducted to minimize the total time of completion using the Campbell Dudek Smith and Dannenbring method in determining efficient production scheduling. Based on the scheduling sequence obtained, the calculation results of the total completion time using the Campbell Dudek Smith method are less than or equal to the results of calculation using the Dannenbring method. So the Campbell Dudek Smith method is more efficient than the Dannenbring method to be applied to CV. Puspa.","PeriodicalId":11600,"journal":{"name":"E-Jurnal Matematika","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"ANALISIS PENJADWALAN PRODUKSI MENGGUNAKAN METODE CAMPBELL DUDEK SMITH DAN DANNENBRING DALAM MEMINIMUMKAN TOTAL WAKTU PRODUKSI BERAS\",\"authors\":\"Ni Kadek Budi Antari, L. Harini, Ni Ketut Tari Tastrawati\",\"doi\":\"10.24843/mtk.2021.v10.i04.p345\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The increasing needs for basic materials has resulted in an increased production process of basic materials in a company. CV. Puspa is a manufacturing company engaged in the production of rice, on the production process, CV. Puspa often has a buildup of work so that it requires an alternative production scheduling optimally. This research was conducted to minimize the total time of completion using the Campbell Dudek Smith and Dannenbring method in determining efficient production scheduling. Based on the scheduling sequence obtained, the calculation results of the total completion time using the Campbell Dudek Smith method are less than or equal to the results of calculation using the Dannenbring method. So the Campbell Dudek Smith method is more efficient than the Dannenbring method to be applied to CV. Puspa.\",\"PeriodicalId\":11600,\"journal\":{\"name\":\"E-Jurnal Matematika\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"E-Jurnal Matematika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24843/mtk.2021.v10.i04.p345\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"E-Jurnal Matematika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/mtk.2021.v10.i04.p345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

对基本材料的需求不断增加,导致公司的基本材料生产流程增加。CV。Puspa是一家从事大米生产的制造公司,在生产过程中,CV。Puspa经常有大量的工作,因此需要最佳的替代生产计划。本研究采用Campbell-Dudek-Smith和Dannenbring方法来确定有效的生产调度,以最大限度地缩短总完工时间。基于所获得的调度序列,使用Campbell-Dudek-Smith方法的总完成时间的计算结果小于或等于使用Dannenbring方法的计算结果。因此,Campbell-Dudek-Smith方法比Dannenbring方法更有效地应用于CV Puspa。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALISIS PENJADWALAN PRODUKSI MENGGUNAKAN METODE CAMPBELL DUDEK SMITH DAN DANNENBRING DALAM MEMINIMUMKAN TOTAL WAKTU PRODUKSI BERAS
The increasing needs for basic materials has resulted in an increased production process of basic materials in a company. CV. Puspa is a manufacturing company engaged in the production of rice, on the production process, CV. Puspa often has a buildup of work so that it requires an alternative production scheduling optimally. This research was conducted to minimize the total time of completion using the Campbell Dudek Smith and Dannenbring method in determining efficient production scheduling. Based on the scheduling sequence obtained, the calculation results of the total completion time using the Campbell Dudek Smith method are less than or equal to the results of calculation using the Dannenbring method. So the Campbell Dudek Smith method is more efficient than the Dannenbring method to be applied to CV. Puspa.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
34
审稿时长
24 weeks
期刊最新文献
The Potential Impact of Agouti Related Peptide and Asprosin on Metabolic Parameters and Eating Behavior in Attention Deficit Hyperactivity Disorder. PENGELOMPOKKAN KABUPATEN DI PROVINSI JAWA TENGAH BERDASARKAN KARAKTERISTIK IKLIM MENGGUNAKAN FUZZY CLUSTERING Perhitungan Premi Asuransi Menggunakan Model Select Table Pada Asuransi Joint Life PENERAPAN MODEL INVENTORI PROBABILISTIK FUZZY MULTIOBJEKTIF PADA SISTEM PERSEDIAAN BUAH SALAK KAUSALITAS ANTARA ANXIETY, SOCIAL PHOBIA TERHADAP PEMAIN VIDEO GAME
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1