{"title":"考虑可变性的船体块安装过程分析","authors":"H. Shen, Yonggil Lee, Yongkuk Jeong, J. Woo","doi":"10.5957/JSPD.07190036","DOIUrl":null,"url":null,"abstract":"The hull block erection network process, which is performed during the master production planning stage of the shipyard, is frequently delayed because of limited resources, workspace, and block preparation ratio. In this study, a study to predict the delay with respect to the block erection schedule is conducted by considering the variability of the block preparation ratio based on the discrete event simulation algorithm. It is confirmed that the variation of the key event observance ratio is confirmed according to the variability caused by the block erection process, which has the minimum lead time in a limited resource environment, and the block preparation ratio. Furthermore, the optimal pitch value for the key event concordance is calculated based on simulation results.","PeriodicalId":48791,"journal":{"name":"Journal of Ship Production and Design","volume":"1 1","pages":"1-11"},"PeriodicalIF":0.5000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis on Hull Block Erection Process Considering Variability\",\"authors\":\"H. Shen, Yonggil Lee, Yongkuk Jeong, J. Woo\",\"doi\":\"10.5957/JSPD.07190036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The hull block erection network process, which is performed during the master production planning stage of the shipyard, is frequently delayed because of limited resources, workspace, and block preparation ratio. In this study, a study to predict the delay with respect to the block erection schedule is conducted by considering the variability of the block preparation ratio based on the discrete event simulation algorithm. It is confirmed that the variation of the key event observance ratio is confirmed according to the variability caused by the block erection process, which has the minimum lead time in a limited resource environment, and the block preparation ratio. Furthermore, the optimal pitch value for the key event concordance is calculated based on simulation results.\",\"PeriodicalId\":48791,\"journal\":{\"name\":\"Journal of Ship Production and Design\",\"volume\":\"1 1\",\"pages\":\"1-11\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Ship Production and Design\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5957/JSPD.07190036\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Ship Production and Design","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5957/JSPD.07190036","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
Analysis on Hull Block Erection Process Considering Variability
The hull block erection network process, which is performed during the master production planning stage of the shipyard, is frequently delayed because of limited resources, workspace, and block preparation ratio. In this study, a study to predict the delay with respect to the block erection schedule is conducted by considering the variability of the block preparation ratio based on the discrete event simulation algorithm. It is confirmed that the variation of the key event observance ratio is confirmed according to the variability caused by the block erection process, which has the minimum lead time in a limited resource environment, and the block preparation ratio. Furthermore, the optimal pitch value for the key event concordance is calculated based on simulation results.
期刊介绍:
Original and timely technical papers addressing problems of shipyard techniques and production of merchant and naval ships appear in this quarterly publication. Since its inception, the Journal of Ship Production and Design (formerly the Journal of Ship Production) has been a forum for peer-reviewed, professionally edited papers from academic and industry sources. As such it has influenced the worldwide development of ship production engineering as a fully qualified professional discipline. The expanded scope seeks papers in additional areas, specifically ship design, including design for production, plus other marine technology topics, such as ship operations, shipping economics, and safety. Each issue contains a well-rounded selection of technical papers relevant to marine professionals.