木材装载作业生产率预测:文献综述

M. Ghaffariyan
{"title":"木材装载作业生产率预测:文献综述","authors":"M. Ghaffariyan","doi":"10.3897/silvabalcanica.22.e69240","DOIUrl":null,"url":null,"abstract":"Loading is considered a bottleneck of the forest harvesting system as it acts as a connection between primary transport and secondary transport (from roadside/ landing to mills or central yards). Any delay during the loading component can cause delay in the primary wood extraction and/ or secondary transportation. This article reviewed the current knowledge on loading productivity studies. Based on the results, the main variables impacting the loading productivity include log size, log lengths, load volume per truck, number of logs (or pieces) per truck and number of safety straps. The productivity of loading operations ranged from 3.4 m3/PMH0 in a manual loading to 168.9 m3/PMH0 using mechanised loaders. The results of this review can assist the academic and industrial users for predicting, controlling and managing the productivity of loading operations. ","PeriodicalId":52662,"journal":{"name":"Silva Balcanica","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Predicting productivity of timber loading operations: a literature review\",\"authors\":\"M. Ghaffariyan\",\"doi\":\"10.3897/silvabalcanica.22.e69240\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Loading is considered a bottleneck of the forest harvesting system as it acts as a connection between primary transport and secondary transport (from roadside/ landing to mills or central yards). Any delay during the loading component can cause delay in the primary wood extraction and/ or secondary transportation. This article reviewed the current knowledge on loading productivity studies. Based on the results, the main variables impacting the loading productivity include log size, log lengths, load volume per truck, number of logs (or pieces) per truck and number of safety straps. The productivity of loading operations ranged from 3.4 m3/PMH0 in a manual loading to 168.9 m3/PMH0 using mechanised loaders. The results of this review can assist the academic and industrial users for predicting, controlling and managing the productivity of loading operations. \",\"PeriodicalId\":52662,\"journal\":{\"name\":\"Silva Balcanica\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Silva Balcanica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3897/silvabalcanica.22.e69240\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Silva Balcanica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3897/silvabalcanica.22.e69240","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

装载被认为是森林采伐系统的瓶颈,因为它是初级运输和次级运输(从路边/着陆到磨坊或中央堆场)之间的连接。装载过程中的任何延迟都可能导致木材初次提取和/或二次运输的延迟。本文综述了目前关于载荷生产率研究的知识。根据结果,影响装载生产率的主要变量包括原木尺寸、原木长度、每辆卡车的装载量、每辆卡车的原木数量(或件)和安全带数量。装载作业的生产率范围从手工装载的3.4 m3/PMH0到使用机械化装载机的168.9 m3/PMH0。本综述的结果可以帮助学术界和工业界用户预测、控制和管理装载作业的生产率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Predicting productivity of timber loading operations: a literature review
Loading is considered a bottleneck of the forest harvesting system as it acts as a connection between primary transport and secondary transport (from roadside/ landing to mills or central yards). Any delay during the loading component can cause delay in the primary wood extraction and/ or secondary transportation. This article reviewed the current knowledge on loading productivity studies. Based on the results, the main variables impacting the loading productivity include log size, log lengths, load volume per truck, number of logs (or pieces) per truck and number of safety straps. The productivity of loading operations ranged from 3.4 m3/PMH0 in a manual loading to 168.9 m3/PMH0 using mechanised loaders. The results of this review can assist the academic and industrial users for predicting, controlling and managing the productivity of loading operations. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8
审稿时长
12 weeks
期刊最新文献
Study on the Coupled Human – Natural System in Velingrad municipality, Bulgaria: a resilience perspective Aquaporins: Multifunctional Players in Plant Growth, Development and Stress Responses Timberlines of the Greek high mountains: status quo at the turn of the millennium Suitable forestry machines for mechanical fuel load reduction and salvage recovery: a short review Mediterranean predatory flies of the Dolichopodidae (Diptera, Empidoidea) family from Bulgaria and Turkey
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1