深基坑岩体提升容器创新技术的实践与发展

IF 2.8 Q2 MINING & MINERAL PROCESSING Mining of Mineral Deposits Pub Date : 2022-12-30 DOI:10.33271/mining16.04.087
Bolatkhan Khussan, A. Abdiev, M. Bitimbayev, S. Kuzmin, Sayat Issagulov, Azamat Matayev
{"title":"深基坑岩体提升容器创新技术的实践与发展","authors":"Bolatkhan Khussan, A. Abdiev, M. Bitimbayev, S. Kuzmin, Sayat Issagulov, Azamat Matayev","doi":"10.33271/mining16.04.087","DOIUrl":null,"url":null,"abstract":"Purpose. The research purpose is to substantiate the rational parameters of innovative container technology for transporting mine rocks in open pits with account of technological advantages. Methods. The winding machine normal operation was determined by calculation performed. The container metal structure was designed in the environment of the Compass-3D software complex. The structural elements were tested for normal operation using computer modeling methods in the APM WinMachine 9.7 program, which gives the possibility to obtain the strength calculation values. Findings. The results of modeling the stresses on the wall of the container and the frame, as well as the yield strength are presented. The test calculation confirms the technical feasibility for operating the dragline-based mine winding machines. The influence of the container capacity on the performance of the winding machine has been determined and the dependence of the economic efficiency of the container technology introduction at the open pit depth has been revealed. Originality. For the first time, on the basis of computer modeling, the parameters of stress distribution on the container wall have been substantiated when performing a strength calculation. It has been determined that the maximum stress in the container wall is 117.52 N/mm2; the principal stress value is 83.85 N/mm2. The safety factor for yield strength is 1.8. The maximum load acting on the structure is 957.5 kgf, which does not exceed the calculated value. Practical implications. The practical importance is to improve mining efficiency, reduce the cost of transporting rocks and ensure automatic container unloading. The use of replaceable containers in open pits can significantly change the formation principles of shovels and transport complexes, increase their performance and the efficiency of shovels in the main processes.","PeriodicalId":43896,"journal":{"name":"Mining of Mineral Deposits","volume":" ","pages":""},"PeriodicalIF":2.8000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Substantiation and development of innovative container technology for rock mass lifting from deep open pits\",\"authors\":\"Bolatkhan Khussan, A. Abdiev, M. Bitimbayev, S. Kuzmin, Sayat Issagulov, Azamat Matayev\",\"doi\":\"10.33271/mining16.04.087\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose. The research purpose is to substantiate the rational parameters of innovative container technology for transporting mine rocks in open pits with account of technological advantages. Methods. The winding machine normal operation was determined by calculation performed. The container metal structure was designed in the environment of the Compass-3D software complex. The structural elements were tested for normal operation using computer modeling methods in the APM WinMachine 9.7 program, which gives the possibility to obtain the strength calculation values. Findings. The results of modeling the stresses on the wall of the container and the frame, as well as the yield strength are presented. The test calculation confirms the technical feasibility for operating the dragline-based mine winding machines. The influence of the container capacity on the performance of the winding machine has been determined and the dependence of the economic efficiency of the container technology introduction at the open pit depth has been revealed. Originality. For the first time, on the basis of computer modeling, the parameters of stress distribution on the container wall have been substantiated when performing a strength calculation. It has been determined that the maximum stress in the container wall is 117.52 N/mm2; the principal stress value is 83.85 N/mm2. The safety factor for yield strength is 1.8. The maximum load acting on the structure is 957.5 kgf, which does not exceed the calculated value. Practical implications. The practical importance is to improve mining efficiency, reduce the cost of transporting rocks and ensure automatic container unloading. The use of replaceable containers in open pits can significantly change the formation principles of shovels and transport complexes, increase their performance and the efficiency of shovels in the main processes.\",\"PeriodicalId\":43896,\"journal\":{\"name\":\"Mining of Mineral Deposits\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.8000,\"publicationDate\":\"2022-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining of Mineral Deposits\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33271/mining16.04.087\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining of Mineral Deposits","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/mining16.04.087","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 5

摘要

意图研究目的是利用技术优势,证实露天矿岩石运输集装箱创新技术的合理参数。方法。绕线机的正常运行是通过计算确定的。容器金属结构是在Compass-3D软件复合体的环境中设计的。在APM WinMachine 9.7程序中,使用计算机建模方法对结构元件的正常运行进行了测试,这为获得强度计算值提供了可能性。调查结果。给出了容器壁和框架上的应力以及屈服强度的建模结果。通过试验计算,验证了牵引式矿井提升机运行的技术可行性。确定了集装箱容量对卷绕机性能的影响,揭示了露天矿深度集装箱技术引进经济效益的相关性。独创性首次在计算机建模的基础上,在进行强度计算时,证实了容器壁上的应力分布参数。已经确定,容器壁中的最大应力为117.52N/mm2;主应力值为83.85N/mm2。屈服强度的安全系数为1.8。作用在结构上的最大载荷为957.5 kgf,不超过计算值。实际意义。实际意义在于提高采矿效率,降低岩石运输成本,确保集装箱自动卸货。在露天矿中使用可更换容器可以显著改变电铲和运输综合体的形成原理,提高其性能和电铲在主要工艺中的效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Substantiation and development of innovative container technology for rock mass lifting from deep open pits
Purpose. The research purpose is to substantiate the rational parameters of innovative container technology for transporting mine rocks in open pits with account of technological advantages. Methods. The winding machine normal operation was determined by calculation performed. The container metal structure was designed in the environment of the Compass-3D software complex. The structural elements were tested for normal operation using computer modeling methods in the APM WinMachine 9.7 program, which gives the possibility to obtain the strength calculation values. Findings. The results of modeling the stresses on the wall of the container and the frame, as well as the yield strength are presented. The test calculation confirms the technical feasibility for operating the dragline-based mine winding machines. The influence of the container capacity on the performance of the winding machine has been determined and the dependence of the economic efficiency of the container technology introduction at the open pit depth has been revealed. Originality. For the first time, on the basis of computer modeling, the parameters of stress distribution on the container wall have been substantiated when performing a strength calculation. It has been determined that the maximum stress in the container wall is 117.52 N/mm2; the principal stress value is 83.85 N/mm2. The safety factor for yield strength is 1.8. The maximum load acting on the structure is 957.5 kgf, which does not exceed the calculated value. Practical implications. The practical importance is to improve mining efficiency, reduce the cost of transporting rocks and ensure automatic container unloading. The use of replaceable containers in open pits can significantly change the formation principles of shovels and transport complexes, increase their performance and the efficiency of shovels in the main processes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Mining of Mineral Deposits
Mining of Mineral Deposits MINING & MINERAL PROCESSING-
CiteScore
5.20
自引率
15.80%
发文量
52
期刊最新文献
Analyzing stability of protective structures as the elements of geotechnical tailing pond safety Mining of non-metallic mineral deposits in the context of Ukraine’s reconstruction in the war and post-war periods Optimizing the blast fragmentation quality of discontinuous rock mass: Case study of Jebel Bouzegza Open-Cast Mine, North Algeria Use of solid mining waste to improve water retention capacity of loamy soils Deformation as a process to transform shape and volume of protective structures of the development mine workings during coal-rock mass off-loading
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1