基于建筑信息模型(BIM)的建设项目合同管理实践——探索性研究

IF 1.6 Q3 MANAGEMENT Facilities Pub Date : 2023-05-30 DOI:10.1108/f-10-2021-0094
S. Alwee, U. K. Zolkafli, H. Salleh
{"title":"基于建筑信息模型(BIM)的建设项目合同管理实践——探索性研究","authors":"S. Alwee, U. K. Zolkafli, H. Salleh","doi":"10.1108/f-10-2021-0094","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.\n\n\nDesign/methodology/approach\nThe exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.\n\n\nFindings\nFindings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.\n\n\nPractical implications\nThe study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.\n\n\nOriginality/value\nThis paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.\n","PeriodicalId":47595,"journal":{"name":"Facilities","volume":" ","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Contract administration practices on building information modelling (BIM)-based construction project – an exploratory study\",\"authors\":\"S. Alwee, U. K. Zolkafli, H. Salleh\",\"doi\":\"10.1108/f-10-2021-0094\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.\\n\\n\\nDesign/methodology/approach\\nThe exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.\\n\\n\\nFindings\\nFindings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.\\n\\n\\nPractical implications\\nThe study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.\\n\\n\\nOriginality/value\\nThis paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.\\n\",\"PeriodicalId\":47595,\"journal\":{\"name\":\"Facilities\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/f-10-2021-0094\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/f-10-2021-0094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

目的数字建筑时代,包括建筑信息建模(BIM),对人员、技术和流程的无缝协作提出了很高的要求,以满足项目交付。参与BIM过程的项目参与者必须确保从一开始就遵守所有法规和合同要求。尽管许多研究揭示了BIM实施过程中产生的各种合同影响,但很少有人研究BIM在合同管理实践中的现状,尤其是在马来西亚建筑业。本研究旨在探索BIM实施的现状,并具体参考设计和施工项目。设计/方法论/方法探索性案例研究涉及公共综合体的建设。对项目参与者进行了半结构化访谈,并对项目的合同指南进行了文件分析,以得出调查结果。发现专题分析的结果揭示了以下五个活动序列,这些活动指导了合同管理实践,特别是在基于BIM的建筑项目的合同前和合同后阶段:项目启动、招标阶段、详细设计、施工和移交准备阶段。大多数活动都是为了成功交付BIM的最终输出。尽管如此,在项目监控、BIM交付物的验证过程以及BIM参与者在满足指定BIM合同要求方面的能力水平方面,仍存在一些不足。实际意义该研究有助于实际理解BIM如何影响项目管理,以及公共客户如何在未来BIM实施中改善合同风险分配。独创性/价值本文披露了当前合同管理的实践,以更好地了解基于BIM的建筑项目在合同前和合同后阶段的BIM管理的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Contract administration practices on building information modelling (BIM)-based construction project – an exploratory study
Purpose The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project. Design/methodology/approach The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings. Findings Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements. Practical implications The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation. Originality/value This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Facilities
Facilities MANAGEMENT-
CiteScore
4.40
自引率
17.40%
发文量
46
期刊介绍: The journal offers thorough, independent and expert papers to inform relevant audiences of thinking and practice in the field, including topics such as: ■Intelligent buildings ■Post-occupancy evaluation (building evaluation) ■Relocation and change management ■Sick building syndrome ■Ergonomics and workplace design ■Environmental and workplace psychology ■Briefing, design and construction ■Energy consumption ■Quality initiatives ■Infrastructure management
期刊最新文献
Facility network design by using k-mean and elbow method: a case of Indian handloom industry Investigating the role of path architecture complexity in users’ movement patterns in hospital circulation systems: case studies in Golestan, Iran Students with disabilities (SWDs) and facilities accessibility in a northern Nigerian public university: dismantling exclusion in achieving SDG4 Students’ support facilities and academic adjustment among first-year undergraduates: evidence from a Nigerian public university Barriers to the adoption of energy management systems in residential buildings
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1