{"title":"收费公路项目成本超支风险因素识别","authors":"A. Nurdiana, R. Susanti, F. Suwarto","doi":"10.1166/ASL.2018.13068","DOIUrl":null,"url":null,"abstract":"In Central Java, Indonesia currently has several toll road projects that are also included in the government’s national strategic project. This project is a series of Trans Java Toll Road, which connects Java from the West to the East. As a national government strategic project, these projects are a priority. The high demands from the government have an impact on project targets primarily related to costs. Unexpected costs in the project arise in an effort to solve problems. Any change in project cost results cost overrun in the project. The purpose of this study is to identify risk factors that affect the occurrence of cost overrun on toll road projects. This research is restricted to toll road objects in Pantura (national strategy project) that are still in the construction process. The method used in this research is qualitative descriptive method. The data used are secondary data derived from previous research on similar topics.","PeriodicalId":7296,"journal":{"name":"Advanced Science Letters","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Identification of Risk Factors Cause Cost Overrun at Toll Road Project\",\"authors\":\"A. Nurdiana, R. Susanti, F. Suwarto\",\"doi\":\"10.1166/ASL.2018.13068\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In Central Java, Indonesia currently has several toll road projects that are also included in the government’s national strategic project. This project is a series of Trans Java Toll Road, which connects Java from the West to the East. As a national government strategic project, these projects are a priority. The high demands from the government have an impact on project targets primarily related to costs. Unexpected costs in the project arise in an effort to solve problems. Any change in project cost results cost overrun in the project. The purpose of this study is to identify risk factors that affect the occurrence of cost overrun on toll road projects. This research is restricted to toll road objects in Pantura (national strategy project) that are still in the construction process. The method used in this research is qualitative descriptive method. The data used are secondary data derived from previous research on similar topics.\",\"PeriodicalId\":7296,\"journal\":{\"name\":\"Advanced Science Letters\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advanced Science Letters\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1166/ASL.2018.13068\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Science Letters","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1166/ASL.2018.13068","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Identification of Risk Factors Cause Cost Overrun at Toll Road Project
In Central Java, Indonesia currently has several toll road projects that are also included in the government’s national strategic project. This project is a series of Trans Java Toll Road, which connects Java from the West to the East. As a national government strategic project, these projects are a priority. The high demands from the government have an impact on project targets primarily related to costs. Unexpected costs in the project arise in an effort to solve problems. Any change in project cost results cost overrun in the project. The purpose of this study is to identify risk factors that affect the occurrence of cost overrun on toll road projects. This research is restricted to toll road objects in Pantura (national strategy project) that are still in the construction process. The method used in this research is qualitative descriptive method. The data used are secondary data derived from previous research on similar topics.
期刊介绍:
ADVANCED SCIENCE LETTERS is a multidisciplinary peer-reviewed journal with a very wide-ranging coverage, consolidates fundamental and applied research activities by publishing proceedings from international scientific, technical and medical conferences in all areas of (1) Physical Sciences, (2) Engineering, (3) Biological Sciences/Health Sciences, (4) Medicine, (5) Computer and Information Sciences, (6) Mathematical Sciences, (7) Agriculture Science and Engineering, (8) Geosciences, and (9) Energy/Fuels/Environmental / Green Science and Engineering, and (10) Education, Social Sciences and Public Policies. This journal does not publish general research articles by individual authors.