{"title":"香港隧道掘进机顶管工程透视:第一部分——设计、操作和技术类型的开发、选择","authors":"Wilson W S Mok, Andrew S W Ng","doi":"10.33430/v28n3thie-2021-0019","DOIUrl":null,"url":null,"abstract":"In this paper, the history of pipejacking works by tunnel boring machines in Hong Kong, their development, selection of design method and tunnel boring machine (TBM), operations, length and alignment of a pipeline, types of techniques to suit different site constraints and ground conditions, and performance of the works are discussed. This paper should be read together with part II, which covers applications, problems encountered, cost and prospects.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A perspective of pipejacking works by tunnel boring machines in Hong Kong: part I – development, selection of design, operations and types of techniques\",\"authors\":\"Wilson W S Mok, Andrew S W Ng\",\"doi\":\"10.33430/v28n3thie-2021-0019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the history of pipejacking works by tunnel boring machines in Hong Kong, their development, selection of design method and tunnel boring machine (TBM), operations, length and alignment of a pipeline, types of techniques to suit different site constraints and ground conditions, and performance of the works are discussed. This paper should be read together with part II, which covers applications, problems encountered, cost and prospects.\",\"PeriodicalId\":35587,\"journal\":{\"name\":\"Transactions Hong Kong Institution of Engineers\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions Hong Kong Institution of Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33430/v28n3thie-2021-0019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33430/v28n3thie-2021-0019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
A perspective of pipejacking works by tunnel boring machines in Hong Kong: part I – development, selection of design, operations and types of techniques
In this paper, the history of pipejacking works by tunnel boring machines in Hong Kong, their development, selection of design method and tunnel boring machine (TBM), operations, length and alignment of a pipeline, types of techniques to suit different site constraints and ground conditions, and performance of the works are discussed. This paper should be read together with part II, which covers applications, problems encountered, cost and prospects.