{"title":"印度铁路:通过Half-Y连接增强东北部的连通性","authors":"Sanjeev Kishore, Vandana Srivastava","doi":"10.1108/tcj-11-2022-0196","DOIUrl":null,"url":null,"abstract":"\nResearch methodology\nThe case has been developed as an illustrative case study using primary data. The data and images used for developing the case have been collected from the Alipurduar Division of Indian Railways with suitable permissions. The specific newspaper studies used in developing the case content have been referenced as footnotes on the relevant pages of the case study document.\n\n\nCase overview/synopsis\nTrain operations in Alipurduar Division of Northeast Frontier Railway zone of Indian Railways are difficult. The division provides the vital rail link between the northeast states and the rest of India. Railway lines in the Alipurduar Division pass through several forests with a significant elephant population. As an outcome of train–elephant conflicts, train operations on one of the railway lines operate under severe speed restrictions. Moreover, the region is known for heavy rainfall and thunderstorms for almost six months every year. For the Divisional Railway Manager (DRM), the protagonist of the case, this implied repeated congestion, traffic disruptions, inadvertent delays and lack of time for critical maintenance of the tracks. A solution was planned several years ago for creating an alternative path to de-congest the traffic; however, it ran into a roadblock due to land acquisition issues.With all these limitations, could a solution be found and implemented? How could it be executed?The case illustrates how a simple yet innovative solution was proposed by the DRM in 2015 and implemented in 2016.With this case, students will be able to understand the innovation process that is embedded within long-term infrastructure projects. The case will help students understand how innovation can take place even in the later stages of project implementation, and how simple and creative solutions can have a long-term impact.\n\n\nComplexity academic level\nThe case can be used in graduate and executive education courses in General Management and in Public Policy Management. It can also be used in Doctoral-Level Programmes such as those taught to scholars pursuing Fellow Programme in Management. Since the case brings out elements of problem framing and critical thinking, the case can be used for courses in strategic management. Many professionals, particularly those working in large organizations dealing with large infrastructure projects, will identify with the DRM and the challenges faced by him.\n","PeriodicalId":52298,"journal":{"name":"CASE Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Indian Railways: enhancing northeast connectivity with Half-Y connection\",\"authors\":\"Sanjeev Kishore, Vandana Srivastava\",\"doi\":\"10.1108/tcj-11-2022-0196\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nResearch methodology\\nThe case has been developed as an illustrative case study using primary data. The data and images used for developing the case have been collected from the Alipurduar Division of Indian Railways with suitable permissions. The specific newspaper studies used in developing the case content have been referenced as footnotes on the relevant pages of the case study document.\\n\\n\\nCase overview/synopsis\\nTrain operations in Alipurduar Division of Northeast Frontier Railway zone of Indian Railways are difficult. The division provides the vital rail link between the northeast states and the rest of India. Railway lines in the Alipurduar Division pass through several forests with a significant elephant population. As an outcome of train–elephant conflicts, train operations on one of the railway lines operate under severe speed restrictions. Moreover, the region is known for heavy rainfall and thunderstorms for almost six months every year. For the Divisional Railway Manager (DRM), the protagonist of the case, this implied repeated congestion, traffic disruptions, inadvertent delays and lack of time for critical maintenance of the tracks. A solution was planned several years ago for creating an alternative path to de-congest the traffic; however, it ran into a roadblock due to land acquisition issues.With all these limitations, could a solution be found and implemented? How could it be executed?The case illustrates how a simple yet innovative solution was proposed by the DRM in 2015 and implemented in 2016.With this case, students will be able to understand the innovation process that is embedded within long-term infrastructure projects. The case will help students understand how innovation can take place even in the later stages of project implementation, and how simple and creative solutions can have a long-term impact.\\n\\n\\nComplexity academic level\\nThe case can be used in graduate and executive education courses in General Management and in Public Policy Management. It can also be used in Doctoral-Level Programmes such as those taught to scholars pursuing Fellow Programme in Management. Since the case brings out elements of problem framing and critical thinking, the case can be used for courses in strategic management. Many professionals, particularly those working in large organizations dealing with large infrastructure projects, will identify with the DRM and the challenges faced by him.\\n\",\"PeriodicalId\":52298,\"journal\":{\"name\":\"CASE Journal\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CASE Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/tcj-11-2022-0196\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CASE Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/tcj-11-2022-0196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
Indian Railways: enhancing northeast connectivity with Half-Y connection
Research methodology
The case has been developed as an illustrative case study using primary data. The data and images used for developing the case have been collected from the Alipurduar Division of Indian Railways with suitable permissions. The specific newspaper studies used in developing the case content have been referenced as footnotes on the relevant pages of the case study document.
Case overview/synopsis
Train operations in Alipurduar Division of Northeast Frontier Railway zone of Indian Railways are difficult. The division provides the vital rail link between the northeast states and the rest of India. Railway lines in the Alipurduar Division pass through several forests with a significant elephant population. As an outcome of train–elephant conflicts, train operations on one of the railway lines operate under severe speed restrictions. Moreover, the region is known for heavy rainfall and thunderstorms for almost six months every year. For the Divisional Railway Manager (DRM), the protagonist of the case, this implied repeated congestion, traffic disruptions, inadvertent delays and lack of time for critical maintenance of the tracks. A solution was planned several years ago for creating an alternative path to de-congest the traffic; however, it ran into a roadblock due to land acquisition issues.With all these limitations, could a solution be found and implemented? How could it be executed?The case illustrates how a simple yet innovative solution was proposed by the DRM in 2015 and implemented in 2016.With this case, students will be able to understand the innovation process that is embedded within long-term infrastructure projects. The case will help students understand how innovation can take place even in the later stages of project implementation, and how simple and creative solutions can have a long-term impact.
Complexity academic level
The case can be used in graduate and executive education courses in General Management and in Public Policy Management. It can also be used in Doctoral-Level Programmes such as those taught to scholars pursuing Fellow Programme in Management. Since the case brings out elements of problem framing and critical thinking, the case can be used for courses in strategic management. Many professionals, particularly those working in large organizations dealing with large infrastructure projects, will identify with the DRM and the challenges faced by him.