印度建筑工程设计延误的影响及补救措施

IF 1.8 Q3 MANAGEMENT Construction Economics and Building Pub Date : 2021-02-24 DOI:10.5130/AJCEB.V21I1.7453
D. Das, F. Emuze
{"title":"印度建筑工程设计延误的影响及补救措施","authors":"D. Das, F. Emuze","doi":"10.5130/AJCEB.V21I1.7453","DOIUrl":null,"url":null,"abstract":"Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2021-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Design Delays in Building Projects in India: Effects and Remedies\",\"authors\":\"D. Das, F. Emuze\",\"doi\":\"10.5130/AJCEB.V21I1.7453\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.\",\"PeriodicalId\":51729,\"journal\":{\"name\":\"Construction Economics and Building\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-02-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Economics and Building\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5130/AJCEB.V21I1.7453\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/AJCEB.V21I1.7453","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

摘要

经验证据表明,与设计相关的挑战会影响印度建筑项目的延迟。根据对印度奥里萨邦首府地区建筑项目的案例研究,已经确定了与顾问和设计相关的因素,并编制了政策干预措施,以减少与设计相关的延误。根据不同的情景,采用了收集数据的调查方法、统计分析和系统动力学建模方法来提出战略干预措施。研究结果表明,文件设计和编制的复杂性,以及两者的综合复杂性,可能会造成重大延误。模型结果表明,任命有能力的顾问和有效沟通的综合效果可以显著减少延误。这项研究的新颖之处在于使用系统方法来发展变量之间的因果反馈关系,而不是一次考虑问题的一个根源。该研究有三个贡献:(1)基于建筑施工中的因果反馈关系,可以诊断出与设计相关的挑战和延误机制,从而制定适当的补救措施;(2) 不同干预措施的影响可以在不同情景下定量可视化;以及(3)提供了一种检查项目周期趋势的替代方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design Delays in Building Projects in India: Effects and Remedies
Empirical evidence shows that design-related challenges influence delay in building projects in India. Based on case studies of building projects from the capital region of Odisha Province of India, the factors relating to consultants and design have been identified and policy interventions were compiled to reduce design linked delay. A survey method to collect data, statistical analysis and a Systems Dynamics modelling approach were used according to different scenarios to propose strategic interventions. The findings suggested that complexity of design and compilation of documents, and the combined complexity of both can cause substantial delay. The model results revealed that the combined effect of appointing competent consultants and communicating effectively could reduce delay significantly. The novelty of the study lies in using a systems approach to develop causal feedback relationships among variables, as opposed to considering one origin of the problem at a time. The study makes three contributions: (1) design-linked challenges and mechanisms of delay, based on causal feedback relationships in building construction, can be diagnosed to evolve appropriate remedial measures; (2) impacts of different interventions can be visualised quantitatively under different scenarios; and (3) an alternative methodology to examine the trend of the project period is offered.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.80
自引率
6.20%
发文量
0
审稿时长
20 weeks
期刊介绍: Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.
期刊最新文献
The Institutional Field Of Learning From Project-Related Failures – Opportunities and Challenges. Framework for Evaluating the Success of Integrated Project Delivery in the Industrial Construction Sector: A Mixed Methods Approach & Machine Learning Application Success Factors of the Consultant Selection Stage of the Ghanaian Public Construction Projects: The Road Sector’s Perspective Roofing Distributor Employee Perception: Workforce Attraction/Retention and Need Adopting qualitative data in conceptual system dynamic modelling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1