发展中国家市场垃圾的吉祥物(市场垃圾堆肥机)案例研究:印度尼西亚雅加达

Q4 Environmental Science Journal of Solid Waste Technology and Management Pub Date : 2022-08-01 DOI:10.5276/jswtm/2022.443
Nova Ulhasanah, M. Sari, Argiffari Akhmad
{"title":"发展中国家市场垃圾的吉祥物(市场垃圾堆肥机)案例研究:印度尼西亚雅加达","authors":"Nova Ulhasanah, M. Sari, Argiffari Akhmad","doi":"10.5276/jswtm/2022.443","DOIUrl":null,"url":null,"abstract":"The large generation of biodegradable waste in developing countries, such as Indonesia, has made composters one of the best processing solutions. Kebayoran Lama Market, as one of the central markets in Jakarta province, has a high waste generation due to its 24-hour market activities.\n This study aims to design Mascot, a compact aerobic composter with practical, hygienic, and easy-to-operate characteristics. The Analytic Hierarchy Process (AHP) method was employed to determine the appropriate material for the composter drum. The parameters measured are physical parameters\n which are easy to do by the general public. The parameters observed included pH, temperature, material shrinkage, and leachate level. By considering the characteristics of market waste, which has high water content, it was designed to have two main compartments to accommodate compost and leachate.\n The percentage of compostable volume shrinkage that occurs during the composting process is 61.25%, and the leachate produced is 26.46 liters. The highest temperature of the composting material was 45°C, with a final composting temperature of 31°C. The lowest pH condition occurred\n 1 day after composting started with a value of 5.5, then the pH value increased gradually until the final composting process (pH 7). The composting process takes 30 days to produce mature compost, while general composting takes 40–60 days to produce mature compost.","PeriodicalId":35783,"journal":{"name":"Journal of Solid Waste Technology and Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Mascot (Market Waste Composter) for Market Waste of Developing Country—case Study: Jakarta, Indonesia\",\"authors\":\"Nova Ulhasanah, M. Sari, Argiffari Akhmad\",\"doi\":\"10.5276/jswtm/2022.443\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The large generation of biodegradable waste in developing countries, such as Indonesia, has made composters one of the best processing solutions. Kebayoran Lama Market, as one of the central markets in Jakarta province, has a high waste generation due to its 24-hour market activities.\\n This study aims to design Mascot, a compact aerobic composter with practical, hygienic, and easy-to-operate characteristics. The Analytic Hierarchy Process (AHP) method was employed to determine the appropriate material for the composter drum. The parameters measured are physical parameters\\n which are easy to do by the general public. The parameters observed included pH, temperature, material shrinkage, and leachate level. By considering the characteristics of market waste, which has high water content, it was designed to have two main compartments to accommodate compost and leachate.\\n The percentage of compostable volume shrinkage that occurs during the composting process is 61.25%, and the leachate produced is 26.46 liters. The highest temperature of the composting material was 45°C, with a final composting temperature of 31°C. The lowest pH condition occurred\\n 1 day after composting started with a value of 5.5, then the pH value increased gradually until the final composting process (pH 7). The composting process takes 30 days to produce mature compost, while general composting takes 40–60 days to produce mature compost.\",\"PeriodicalId\":35783,\"journal\":{\"name\":\"Journal of Solid Waste Technology and Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Solid Waste Technology and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5276/jswtm/2022.443\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Environmental Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Solid Waste Technology and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5276/jswtm/2022.443","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

摘要

印度尼西亚等发展中国家产生的大量可生物降解废物使堆肥成为最好的处理解决方案之一。Kebayoran Lama市场作为雅加达省的中心市场之一,由于其24小时的市场活动,产生的废物量很高。本课题旨在设计一种实用、卫生、易操作的紧凑型好氧堆肥机Mascot。采用层次分析法(AHP)确定堆肥桶的适宜材料。测量的参数是物理参数,一般大众很容易做到。观察到的参数包括pH、温度、材料收缩率和渗滤液水平。考虑到市场垃圾的特点,这是高含水量,它被设计成有两个主要隔间容纳堆肥和渗滤液。堆肥过程中可堆肥体积收缩率为61.25%,产生的渗滤液为26.46升。堆肥材料的最高温度为45℃,最终堆肥温度为31℃。开始堆肥后第1天pH值最低,为5.5,之后pH值逐渐升高,直到最后的堆肥过程(pH 7)。堆肥过程需要30天才能产生成熟的堆肥,而一般堆肥需要40-60天才能产生成熟的堆肥。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Mascot (Market Waste Composter) for Market Waste of Developing Country—case Study: Jakarta, Indonesia
The large generation of biodegradable waste in developing countries, such as Indonesia, has made composters one of the best processing solutions. Kebayoran Lama Market, as one of the central markets in Jakarta province, has a high waste generation due to its 24-hour market activities. This study aims to design Mascot, a compact aerobic composter with practical, hygienic, and easy-to-operate characteristics. The Analytic Hierarchy Process (AHP) method was employed to determine the appropriate material for the composter drum. The parameters measured are physical parameters which are easy to do by the general public. The parameters observed included pH, temperature, material shrinkage, and leachate level. By considering the characteristics of market waste, which has high water content, it was designed to have two main compartments to accommodate compost and leachate. The percentage of compostable volume shrinkage that occurs during the composting process is 61.25%, and the leachate produced is 26.46 liters. The highest temperature of the composting material was 45°C, with a final composting temperature of 31°C. The lowest pH condition occurred 1 day after composting started with a value of 5.5, then the pH value increased gradually until the final composting process (pH 7). The composting process takes 30 days to produce mature compost, while general composting takes 40–60 days to produce mature compost.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Solid Waste Technology and Management
Journal of Solid Waste Technology and Management Environmental Science-Waste Management and Disposal
CiteScore
0.60
自引率
0.00%
发文量
30
期刊介绍: The Journal of Solid Waste Technology and Management is an international peer-reviewed journal covering landfill, recycling, waste-to-energy, waste reduction, policy and economics, composting, waste collection and transfer, municipal waste, industrial waste, residual waste and other waste management and technology subjects. The Journal is published quarterly (February, May, August, November) by the Widener University School of Engineering. It is supported by a distinguished international editorial board.
期刊最新文献
Roles of Public Financing to Address Urban Faecal Sludge Management (FSM) Services in Bangladesh: a Study of Dhaka And Faridpur Cities Removal of Nickel (II) Ion from an Aqueous Solution Using Red Brick as an Adsorbent Assessment of Solid Waste Management Practices and Role of Community Participation in Mettu Town, Ethiopia 'Clean Food': A Model for Safe and Sustainable Agriculture Towards Accomplishment of Circular Economy Improving Solid Waste Management Practices in Primary Schools in Ibadan, Nigeria
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1