{"title":"根据ISO 31000标准对太阳袭击的风险评估","authors":"Igor Lavrnić, A. Bašić, D. Viduka","doi":"10.30765/er.1566","DOIUrl":null,"url":null,"abstract":"Energy supply remains the greatest challenge for many of Eastern European countries and their economy. In post-soviet and ex-Yugoslavian countries, till today there exists a system where some of the power plants rely on high voltage (HV) and medium voltage (MV) power grids in the process of distribution of electric energy (EE) to final consumers. This makes them vulnerable to solar storms due to HV power transformers which are especially sensitive to geomagnetic induced current (GIC). The acquisition of electrical power infrastructure could put the electrical infrastructure out of service from a couple of months to a year or more. Loss of income, for ordinary families, is a primary hazard of a long power outage. Business continuity of industry and other critical infrastructures (CI) is important in this scenario, but it is a significant challenge for small businesses and enterprises as well. This paper introduces ISO 31000 standard to such scenarios with the primary goal of achieving resilience of companies against such disaster as a new method of vial response to avoid scope of similar hazards.","PeriodicalId":44022,"journal":{"name":"Engineering Review","volume":" ","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2021-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Risk assessment of a solar attack according to ISO 31000 standard\",\"authors\":\"Igor Lavrnić, A. Bašić, D. Viduka\",\"doi\":\"10.30765/er.1566\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Energy supply remains the greatest challenge for many of Eastern European countries and their economy. In post-soviet and ex-Yugoslavian countries, till today there exists a system where some of the power plants rely on high voltage (HV) and medium voltage (MV) power grids in the process of distribution of electric energy (EE) to final consumers. This makes them vulnerable to solar storms due to HV power transformers which are especially sensitive to geomagnetic induced current (GIC). The acquisition of electrical power infrastructure could put the electrical infrastructure out of service from a couple of months to a year or more. Loss of income, for ordinary families, is a primary hazard of a long power outage. Business continuity of industry and other critical infrastructures (CI) is important in this scenario, but it is a significant challenge for small businesses and enterprises as well. This paper introduces ISO 31000 standard to such scenarios with the primary goal of achieving resilience of companies against such disaster as a new method of vial response to avoid scope of similar hazards.\",\"PeriodicalId\":44022,\"journal\":{\"name\":\"Engineering Review\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2021-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30765/er.1566\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30765/er.1566","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
Risk assessment of a solar attack according to ISO 31000 standard
Energy supply remains the greatest challenge for many of Eastern European countries and their economy. In post-soviet and ex-Yugoslavian countries, till today there exists a system where some of the power plants rely on high voltage (HV) and medium voltage (MV) power grids in the process of distribution of electric energy (EE) to final consumers. This makes them vulnerable to solar storms due to HV power transformers which are especially sensitive to geomagnetic induced current (GIC). The acquisition of electrical power infrastructure could put the electrical infrastructure out of service from a couple of months to a year or more. Loss of income, for ordinary families, is a primary hazard of a long power outage. Business continuity of industry and other critical infrastructures (CI) is important in this scenario, but it is a significant challenge for small businesses and enterprises as well. This paper introduces ISO 31000 standard to such scenarios with the primary goal of achieving resilience of companies against such disaster as a new method of vial response to avoid scope of similar hazards.
期刊介绍:
Engineering Review is an international journal designed to foster the exchange of ideas and transfer of knowledge between scientists and engineers involved in various engineering sciences that deal with investigations related to design, materials, technology, maintenance and manufacturing processes. It is not limited to the specific details of science and engineering but is instead devoted to a very wide range of subfields in the engineering sciences. It provides an appropriate resort for publishing the papers covering prior applications – based on the research topics comprising the entire engineering spectrum. Topics of particular interest thus include: mechanical engineering, naval architecture and marine engineering, fundamental engineering sciences, electrical engineering, computer sciences and civil engineering. Manuscripts addressing other issues may also be considered if they relate to engineering oriented subjects. The contributions, which may be analytical, numerical or experimental, should be of significance to the progress of mentioned topics. Papers that are merely illustrations of established principles or procedures generally will not be accepted. Occasionally, the magazine is ready to publish high-quality-selected papers from the conference after being renovated, expanded and written in accordance with the rules of the magazine. The high standard of excellence for any of published papers will be ensured by peer-review procedure. The journal takes into consideration only original scientific papers.