大型项目危机的关键前兆调查

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS ACS Applied Bio Materials Pub Date : 2022-07-01 DOI:10.1108/ijmpb-09-2021-0234
Aimin Wang
{"title":"大型项目危机的关键前兆调查","authors":"Aimin Wang","doi":"10.1108/ijmpb-09-2021-0234","DOIUrl":null,"url":null,"abstract":"PurposeDetecting precursory signals is critical to increasing the resilience of megaprojects to crises. This study aims to investigate key crisis precursors to better apprehend traces of megaproject crises and proactively respond to approaching crises, thereby increasing project resilience.Design/methodology/approachDrawing on the theory of weak signals, 25 potential precursors of megaproject crises are extracted. Using exploratory structural equation modeling (ESEM), four models were tested to identify key crisis precursors based on a questionnaire survey of 168 megaproject participants in China. Analysis of variance (ANOVA) was employed to examine the differences in participants’ perceptions of key crisis precursors.FindingsFour key crisis precursors were identified: Imbalance of Benefits and Costs, Irresponsible and Unqualified Key Participants, Regulatory Mechanisms Lacking Transparency and Flexibility, and Information Uncertainty and Asymmetry. Compared with senior executives, team members think that key crisis precursors related to regulatory mechanisms and key participants are more likely to trigger crises, which affects responsive actions toward detected crisis precursors. The findings help identify problems at an early stage and enable timely intervention to mitigate crises.Research limitations/implicationsDetection of key crisis precursors allows for proactive and targeted actions to mitigate crises. Megaproject development is affected by institutional mechanisms. The influence of institutions on the effectiveness of crisis management needs further investigation.Originality/valueLimited attention has been paid to recognizing precursors of megaproject crises. This study identifies four key crisis precursors by uncovering the interrelationships among potential precursors, which enables rapid adaptation to future crises.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2022-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An investigation of key precursors of megaproject crises\",\"authors\":\"Aimin Wang\",\"doi\":\"10.1108/ijmpb-09-2021-0234\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeDetecting precursory signals is critical to increasing the resilience of megaprojects to crises. This study aims to investigate key crisis precursors to better apprehend traces of megaproject crises and proactively respond to approaching crises, thereby increasing project resilience.Design/methodology/approachDrawing on the theory of weak signals, 25 potential precursors of megaproject crises are extracted. Using exploratory structural equation modeling (ESEM), four models were tested to identify key crisis precursors based on a questionnaire survey of 168 megaproject participants in China. Analysis of variance (ANOVA) was employed to examine the differences in participants’ perceptions of key crisis precursors.FindingsFour key crisis precursors were identified: Imbalance of Benefits and Costs, Irresponsible and Unqualified Key Participants, Regulatory Mechanisms Lacking Transparency and Flexibility, and Information Uncertainty and Asymmetry. Compared with senior executives, team members think that key crisis precursors related to regulatory mechanisms and key participants are more likely to trigger crises, which affects responsive actions toward detected crisis precursors. The findings help identify problems at an early stage and enable timely intervention to mitigate crises.Research limitations/implicationsDetection of key crisis precursors allows for proactive and targeted actions to mitigate crises. Megaproject development is affected by institutional mechanisms. The influence of institutions on the effectiveness of crisis management needs further investigation.Originality/valueLimited attention has been paid to recognizing precursors of megaproject crises. This study identifies four key crisis precursors by uncovering the interrelationships among potential precursors, which enables rapid adaptation to future crises.\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2022-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1108/ijmpb-09-2021-0234\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-09-2021-0234","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 2

摘要

目的检测前兆信号对于提高大型项目应对危机的能力至关重要。本研究旨在调查关键的危机前兆,以更好地了解大型项目危机的痕迹,并积极应对即将到来的危机,从而提高项目的应变能力。设计/方法论/方法利用弱信号理论,提取了25个大型项目危机的潜在前兆。基于对中国168名大型项目参与者的问卷调查,使用探索性结构方程模型(ESEM),对四个模型进行了测试,以确定关键的危机前兆。采用方差分析(ANOVA)来检验参与者对关键危机前兆的认知差异。发现了四个关键的危机前兆:利益和成本失衡、不负责任和不合格的关键参与者、缺乏透明度和灵活性的监管机制以及信息的不确定性和不对称性。与高级管理人员相比,团队成员认为与监管机制和关键参与者相关的关键危机前兆更有可能引发危机,从而影响对检测到的危机前兆的响应行动。这些发现有助于在早期阶段发现问题,并使及时干预能够缓解危机。研究局限性/影响检测关键危机前兆可以采取积极和有针对性的行动来缓解危机。大型项目的发展受到体制机制的影响。制度对危机管理有效性的影响需要进一步调查。独创性/价值对识别大型项目危机的前兆关注有限。这项研究通过揭示潜在前兆之间的相互关系,确定了四个关键的危机前兆,从而能够快速适应未来的危机。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An investigation of key precursors of megaproject crises
PurposeDetecting precursory signals is critical to increasing the resilience of megaprojects to crises. This study aims to investigate key crisis precursors to better apprehend traces of megaproject crises and proactively respond to approaching crises, thereby increasing project resilience.Design/methodology/approachDrawing on the theory of weak signals, 25 potential precursors of megaproject crises are extracted. Using exploratory structural equation modeling (ESEM), four models were tested to identify key crisis precursors based on a questionnaire survey of 168 megaproject participants in China. Analysis of variance (ANOVA) was employed to examine the differences in participants’ perceptions of key crisis precursors.FindingsFour key crisis precursors were identified: Imbalance of Benefits and Costs, Irresponsible and Unqualified Key Participants, Regulatory Mechanisms Lacking Transparency and Flexibility, and Information Uncertainty and Asymmetry. Compared with senior executives, team members think that key crisis precursors related to regulatory mechanisms and key participants are more likely to trigger crises, which affects responsive actions toward detected crisis precursors. The findings help identify problems at an early stage and enable timely intervention to mitigate crises.Research limitations/implicationsDetection of key crisis precursors allows for proactive and targeted actions to mitigate crises. Megaproject development is affected by institutional mechanisms. The influence of institutions on the effectiveness of crisis management needs further investigation.Originality/valueLimited attention has been paid to recognizing precursors of megaproject crises. This study identifies four key crisis precursors by uncovering the interrelationships among potential precursors, which enables rapid adaptation to future crises.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1