集成项目交付(IPD):一个最新的回顾和分析案例研究

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-03-27 DOI:10.2478/jeppm-2020-0017
Marina L. Viana, B. Hadikusumo, M. Z. Mohammad, Zahra Kahvandi
{"title":"集成项目交付(IPD):一个最新的回顾和分析案例研究","authors":"Marina L. Viana, B. Hadikusumo, M. Z. Mohammad, Zahra Kahvandi","doi":"10.2478/jeppm-2020-0017","DOIUrl":null,"url":null,"abstract":"Abstract Integrated Project Delivery (IPD) is introduced as a new delivery system that fosters high efficiency by delivering accurate information and new technologies in a collaborative team environment. In this sense, the research aimed to review the IPD principles and their main categories, such as contract, process, information & modeling (I&M), team and communication as well as perform a qualitative analysis to illustrate the current research trends. The qualitative analysis performed was made through a series of collected articles from 2001 to 2018 in 08 different scientific database websites. In terms of the results, the contract category illustrated a strong trend, where the studies are focus on collaborations and frameworks to enhance high efficiency in construction. In the I&M category, demonstrated an increasing trend applying the Building Information & Modeling (BIM) subject as well as team category, where showed the importance of a wellstructured team and their impact on the project., The process and communication categories illustrated a weak trend, allowing opportunities in the field. Finally, the current study reviewed and analyzed the IPD and its main categories allowing a solid basis for future research.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":"{\"title\":\"Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study\",\"authors\":\"Marina L. Viana, B. Hadikusumo, M. Z. Mohammad, Zahra Kahvandi\",\"doi\":\"10.2478/jeppm-2020-0017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Integrated Project Delivery (IPD) is introduced as a new delivery system that fosters high efficiency by delivering accurate information and new technologies in a collaborative team environment. In this sense, the research aimed to review the IPD principles and their main categories, such as contract, process, information & modeling (I&M), team and communication as well as perform a qualitative analysis to illustrate the current research trends. The qualitative analysis performed was made through a series of collected articles from 2001 to 2018 in 08 different scientific database websites. In terms of the results, the contract category illustrated a strong trend, where the studies are focus on collaborations and frameworks to enhance high efficiency in construction. In the I&M category, demonstrated an increasing trend applying the Building Information & Modeling (BIM) subject as well as team category, where showed the importance of a wellstructured team and their impact on the project., The process and communication categories illustrated a weak trend, allowing opportunities in the field. Finally, the current study reviewed and analyzed the IPD and its main categories allowing a solid basis for future research.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"17\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 17

摘要

摘要集成项目交付(IPD)是一种新的交付系统,通过在协作团队环境中交付准确的信息和新技术来提高效率。从这个意义上说,本研究旨在回顾IPD原则及其主要类别,如合同、流程、信息与建模(I&M)、团队和沟通,并进行定性分析,以说明当前的研究趋势。通过2001年至2018年在08个不同的科学数据库网站上收集的一系列文章进行了定性分析。就结果而言,合同类别显示出一种强烈的趋势,研究的重点是合作和框架,以提高施工的高效率。在I&M类别中,展示了应用建筑信息与建模(BIM)主题和团队类别的增长趋势,其中显示了结构良好的团队的重要性及其对项目的影响。,流程和沟通类别显示出一种疲软的趋势,这为该领域提供了机会。最后,本研究对IPD及其主要类别进行了回顾和分析,为未来的研究奠定了坚实的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study
Abstract Integrated Project Delivery (IPD) is introduced as a new delivery system that fosters high efficiency by delivering accurate information and new technologies in a collaborative team environment. In this sense, the research aimed to review the IPD principles and their main categories, such as contract, process, information & modeling (I&M), team and communication as well as perform a qualitative analysis to illustrate the current research trends. The qualitative analysis performed was made through a series of collected articles from 2001 to 2018 in 08 different scientific database websites. In terms of the results, the contract category illustrated a strong trend, where the studies are focus on collaborations and frameworks to enhance high efficiency in construction. In the I&M category, demonstrated an increasing trend applying the Building Information & Modeling (BIM) subject as well as team category, where showed the importance of a wellstructured team and their impact on the project., The process and communication categories illustrated a weak trend, allowing opportunities in the field. Finally, the current study reviewed and analyzed the IPD and its main categories allowing a solid basis for future research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1